You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
AGING PROCESSES IN NUCLEAR REACTORS
SBC: Pdi Technology Inc Topic: N/AAS NUCLEAR PLANTS GROW OLDER, ENVIRONMENTAL CONDITIONS MAY AFFECT THE PERFORMANCE OF PLANT CONCRETE AND STEEL STRUCTURES. WE PROPOSE TO DEVELOP A STRATEGY WHICH CAN BE APPLIED TO CONCRETE STRUCTURES. IT WILL BE DIRECTED TOWARDSTHE DEVELOPMENT OF METHODS TO ANALYZE AND UNDERSTAND AGING EFFECTS, INCLUDING THE COMBINED EFFECTS OF TIME, TEMPERATURE, RADIATION, HUMIDITY, STRESS, CHEMICAL ENVIRONMENT AN ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
AUTOMATIC CREATION AND RENODALIZATION OF TRAC-BWR INPUT DECKS
SBC: Expert-ease Systems Topic: N/ATHE OBJECTIVE OF THE PROPOSED RESEARCH IS TO BUILD A USER-FRIENDLY, PERSONAL COMPUTER BASED WORKSTATION FOR PERFORMING TRAC-BWR ANALYSIS. THE SOFTWARE WILL ALLOW A USER TO READ-IN DATA FROM EXISTING TRAC-BWR INPUT DECKS (ASCII), DRAW NODALIZATION DIAGRAM, MODIFY INPUT, AUTOMATICALLY RENODALIZE THE VESSEL, CHAN AND PIPE COMPONENTS, GENERATE INPUT DECK, SUBMIT JOB, BRING BACK PLOTDATA, DISPLAY RESUL ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
FACILITATE DEVELOPMENT AND EVALUATION OF FAULT TREES
SBC: Expert-ease Systems Topic: N/AWORKSTATION AND EXPERT SYSTEM TECHNOLOGIES HAVE A POTENTIAL OF SUBSTANTIALLY FACILITATING THE DEVELOPMENT AND EVALUATIONOF FAULT TREES. INTRODUCING A WORKSTATION PHILOSOPHY WITH AN INTERACTIVE SET OF INTEGRATED SOFTWARE TOOLS ON A LOCAL COMPUTER WILL PROMOTE IMPROVED CONTINUITY IN THE THOUGHT PROCESS DURING A FAULT TREE DEVELOPMENT. THE EXPERT SYSTEM TECHNOLOGY WILL SIMPLIFY THE WAY FAULT TREES AR ...
SBIR Phase I 1985 Nuclear Regulatory Commission -
GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION
SBC: CREARE LLC Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission -
IN-REACTOR MEASUREMENTS INVOLVING ELECTROCHEMICAL POTENTIAL A NUMBER OF BOILING WATER REACTORS (BWRS) SUGGEST THAT THE WATER CHEMISTRY OF THE PRIMARY COOLANT OF EACH BWR MAY BE UNIQUE WITH RESPECT TO ITS ABILITY TO FACILITATE IGSCC AND/ OR MAY CHANGE
SBC: Michael Fox Topic: N/AIN-REACTOR MEASUREMENTS INVOLVING ELECTROCHEMICAL POTENTIAL A NUMBER OF BOILING WATER REACTORS (BWRS) SUGGEST THAT THE WATER CHEMISTRY OF THE PRIMARY COOLANT OF EACH BWR MAY BE UNIQUE WITH RESPECT TO ITS ABILITY TO FACILITATE IGSCC AND/ OR MAY CHANGE WITH REACTOR OPERATING TIME OR AGE. THE WORK PROPOSED IS TO GATHER, REVIEW, ORGANIZE, COMPILE, C COMPUTERIZE, AND ANALYZE IN-REACTOR DATA PERTAINING ...
SBIR Phase I 1985 Nuclear Regulatory Commission -
METHODS TO UNDERSTAND AND ANALYZE AGING EFFECTS
SBC: Sea Consultants Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission -
PRESSURIZED WATER REACTOR TRANSIENT ANALYSIS MODEL
SBC: Levy S Inc Topic: N/ATHIS PROPOSAL DESCRIBES A PROGRAM FOR THE DEVELOPMENT OF A PRESSURIZED WATER REACTOR (PWR) TRANSIENT ANALYSIS MODEL FOR USE ON A MICROCOMPUTER. THE INTENDED APPLICATION OF THIS PWR MODEL IS FOR ANALYSIS OF PWR SYSTEM RESPONSE, INCLUDING FORCED AND NATURAL CIRCULATION OPERATION. THE PRIMARY USER OF SUCH A MODEL WOULD BE A UTILITY OR NUCLEAR REGULATORY COMMISSION (NRC) ENGINEER OR PLANT OPERATOR PER ...
SBIR Phase II 1984 Nuclear Regulatory Commission -
PROBABILITY OF FLOODS WITH VERY LONG RETURN PERIODS
SBC: Linsley Kraeger Associates Ltd Topic: N/ATHIS PROPOSAL IS DIRECTED TO THE DEVELOPMENT OF A PROCEDURE FOR GENERATING LONG STREAMFLOW SEQUENCES. IT IS PROPOSED TO FIRST DEVELOP A LONG SEQUENCE OF HOURLY RAINFALL BY STOCHASTIC METHODS AND TO TRANSFORM THIS RAINFALL SEQUENCE INTO STREAMFLOW WITH A DETERMINISTIC HYDROLOGIC MODEL. PHASE I WILL FOCUS ON THE A STOCHASTIC RAINFALL MODEL CAPABLE OF DEVELOPING RAINFALL SEQUENCES AT MULTIPLE SITES. ...
SBIR Phase II 1985 Nuclear Regulatory Commission -
PROBABILITY OF FLOODS WITH VERY LONG RETURN PERIODS
SBC: Linsley Kraeger Associates Ltd Topic: N/AN/A
SBIR Phase I 1984 Nuclear Regulatory Commission -
"EXTENDING A HCLPF-BASED SEISMIC MARGIN REVIEW TO ANALYZE PLANT DAMAGE STATES AND THE ROLE OF HUMAN FACTORS AND NON-SEISMIC FAILURES"
SBC: Future Resources Associate Inc Topic: N/ATECHNIQUES HAVE RECENTLY BEEN DEVELOPED TO ANALYZE THE 'SEISMIC MARGIN' OF A NUCLEAR POWER PLANT USING THE HCLPF CONCEPT (HIGH CONFIDENCE OF A LOW PROBABILITY OF FAILURE). STARTING WITH AN EARTHQUAKE LEVEL SHOSEN FOR MARGIN REVIEW, THE TECHNIQUE DETERMINES WHETHER THE PLANT CAN OR CANNOT 'WITHSTAND THE REVIEW-EARTHQUAKE WITHOUT CORE DAMAGE. HERE 'WITHSTAND' MEANS 'WITHSTAND WITH A HIGH CONFIDENCE ...
SBIR Phase II 1987 Nuclear Regulatory Commission