You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AGING PROCESSES IN NUCLEAR REACTORS

    SBC: Pdi Technology Inc            Topic: N/A

    AS NUCLEAR PLANTS GROW OLDER, ENVIRONMENTAL CONDITIONS MAY AFFECT THE PERFORMANCE OF PLANT CONCRETE AND STEEL STRUCTURES. WE PROPOSE TO DEVELOP A STRATEGY WHICH CAN BE APPLIED TO CONCRETE STRUCTURES. IT WILL BE DIRECTED TOWARDSTHE DEVELOPMENT OF METHODS TO ANALYZE AND UNDERSTAND AGING EFFECTS, INCLUDING THE COMBINED EFFECTS OF TIME, TEMPERATURE, RADIATION, HUMIDITY, STRESS, CHEMICAL ENVIRONMENT AN ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  2. AN ADAPTING FINITE ELEMENT MODEL FOR UNSATURATED POROUS MEDIA

    SBC: Advanced Projects Research, Incorporated            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  3. AUTOMATIC CREATION AND RENODALIZATION OF TRAC-BWR INPUT DECKS

    SBC: Expert-ease Systems            Topic: N/A

    THE OBJECTIVE OF THE PROPOSED RESEARCH IS TO BUILD A USER-FRIENDLY, PERSONAL COMPUTER BASED WORKSTATION FOR PERFORMING TRAC-BWR ANALYSIS. THE SOFTWARE WILL ALLOW A USER TO READ-IN DATA FROM EXISTING TRAC-BWR INPUT DECKS (ASCII), DRAW NODALIZATION DIAGRAM, MODIFY INPUT, AUTOMATICALLY RENODALIZE THE VESSEL, CHAN AND PIPE COMPONENTS, GENERATE INPUT DECK, SUBMIT JOB, BRING BACK PLOTDATA, DISPLAY RESUL ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  4. COMPUTERIZED EMERGENCY OPERATION PROCEDURES RESEARCH

    SBC: Accident Prevention Group            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  5. DEVELOPMENT OF PROTOTYPE MATH MODELING CONSTRUCTION SOFTWAREFOR HIGH SCHOOL MATH AND PHYSICAL SCIENCE COURSEWARE

    SBC: Microcosm, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of Education
  6. DEVELOPMENT OF SMALL BUSINESS INNOVATION FOR PROMOTING SUPPORTED WORK OPPORTUNITIES

    SBC: Berkeley Planning Associates            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of Education
  7. DEVELOPMENT OF TOOLS FOR SAFETY ANALYSIS OF CONTROL SOFTWARE IN ADVANCED REACTORS

    SBC: Advanced Systems Concepts            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  8. ENGLISH-WRITING SOFTWARE FOR ESL STUDENTS

    SBC: Emerson & Stern Associates Inc            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of Education
  9. FACILITATE DEVELOPMENT AND EVALUATION OF FAULT TREES

    SBC: Expert-ease Systems            Topic: N/A

    WORKSTATION AND EXPERT SYSTEM TECHNOLOGIES HAVE A POTENTIAL OF SUBSTANTIALLY FACILITATING THE DEVELOPMENT AND EVALUATIONOF FAULT TREES. INTRODUCING A WORKSTATION PHILOSOPHY WITH AN INTERACTIVE SET OF INTEGRATED SOFTWARE TOOLS ON A LOCAL COMPUTER WILL PROMOTE IMPROVED CONTINUITY IN THE THOUGHT PROCESS DURING A FAULT TREE DEVELOPMENT. THE EXPERT SYSTEM TECHNOLOGY WILL SIMPLIFY THE WAY FAULT TREES AR ...

    SBIR Phase I 1985 Nuclear Regulatory Commission
  10. IMPROVING TECHNOLOGY, TRAINING, AND OPPORTUNITIES FOR BLIND PEOPLE IN WORD PROCESSING.

    SBC: Telesensory Systems Inc.            Topic: N/A

    WHILE WORD PROCESSING JOBS INCREASE WITH SERVICE INDUSTRY GROWTH, BLIND TYPISTS ARE ACTUALLY LOSING JOBS. ADAPTIVE DEVICES DESIGNED TO READ TYPWRITERS IN THE 70'S UNDERUTILIZE WORD PROCESSORS IN THE 80'S. AS THE TECHNOLOGY GAP EXPANDS, COMPETITIVE EMPLOYMENT IS INCREASINGLY DIFFICULT. TRAINING PROGRAMS FOR THE BLIND ARE BECOMING DISARRAYED. NEW TECHNOLOGIES HAVE POTENTIAL TO MODIFY EXISTING OFFICE ...

    SBIR Phase II 1985 Department of Education
US Flag An Official Website of the United States Government