Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. Physics-Based Improvements for Continuous Active Sonar (CAS)

    SBC: Signal Systems Corporation            Topic: N181057

    Signal Systems Corporation proposes to develop and evaluate a novel motion-adaptive matched filter, tuning standard replicas to account for time-varying delays observed in received continuous active sonar (CAS) echoes. The method directly incorporates detailed physics models of the time-varying delays of linear frequency modulation (LFM) sweeps into the estimation algorithms, accounting for unknow ...

    SBIR Phase II 2019 Department of DefenseNavy
  2. Distributed Intelligence Gathering System (DIGS) Network Development

    SBC: EMERGENT SPACE TECHNOLOGIES, INC.            Topic: NASAS401

    An ad hoc network of small computing nodes is used to gather sensor measurements available from distributed sensor systems. Traditional communications (comm) systems used by sensor networks rely on a hub and spoke architecture that is prone to bottle-necks and routing disruptions. In a cluster or formation or mobile systems, routing of data must be more dynamic and ideally would make use of divers ...

    SBIR Phase II 2019 Department of DefenseNavy
  3. Cyber Threat Insertion and Evaluation Technology for Navy Ship Control Systems

    SBC: Amida Technology Solutions, Inc.            Topic: N171054

    Amida's Phase II prototype will be a user system comprised of an Evaluation Methodology, a Hardware Emulation Unit, and several software items (Trojan/Trigger Insertion, Instrument/ Countermeasure Insertion, Data Collection and Analysis, and an Evaluation Recommendation). It will be instantiated as a physical device and enable a user to evaluate a system in a virtualized and safe environment and e ...

    SBIR Phase II 2019 Department of DefenseNavy
  4. Beyond Line of Sight (BLOS) High Data Rate Communications

    SBC: First RF Corporation            Topic: N171001

    During Phase II, FIRST RF will develop and evaluate concepts enabling beyond line-of-sight (BLOS) communications using field-deployable multi-band arrays. The novel multi-band array topology allows fielding of a compact and lightweight system that operates over L-Band, S-Band, C-Band, and Ku-Band, has a 360 field of regard in azimuth, and can maintain a 20 Mb/s data link over each band at distance ...

    SBIR Phase II 2019 Department of DefenseNavy
  5. Selective Emission of Light Utilizing Functionally-Graded Energetic Materials

    SBC: Special Aerospace Services            Topic: N172115

    Flares are commonly used in the defense industry as light utilizing functionally-graded energetic materials for airborne expendable countermeasure applications. However, current flare production processes are rudimentary because they limit design flexibility and incur significant start up and maintenance costs due to low annual production volume. Additive Manufacturing (AM) is a superior alternati ...

    SBIR Phase II 2019 Department of DefenseNavy
  6. Electronic Ticket Reporting Individual Performance System (E-TRIP) for Tactical Vehicles

    SBC: Intelligent Automation, Inc.            Topic: N171003

    Ground tactical vehicle mishaps result in damaged or destroyed government property, huge cost in medical treatment, deaths, and permanent disabilities of the personnel involved. Efficient monitoring of tactical vehicle operators driving style and performance becomes critical to the safety and effectiveness of vehicle training and operations. In addition, fuel efficiency and condition based mainten ...

    SBIR Phase II 2019 Department of DefenseNavy
  7. Rapid Prototype Portable Combat and Launch System

    SBC: SYSTEMS ENGINEERING ASSOCIATES CORPORATION            Topic: N95053

    SEA CORP will leverage the innovative technologies developed under the prior SBIR Phase II project and extend the Research & Development (R&D) activities to the development of critical submarine combat system payload integration efforts. In the previous effort, components were successfully developed facilitating integration of Improved Submarine Launched Mobile Mine (ISLMM) capability aboard subma ...

    SBIR Phase II 2019 Department of DefenseNavy
  8. Solid State Radar Emitter Identification

    SBC: SYSTEMS ENGINEERING ASSOCIATES CORPORATION            Topic: N171043

    The ultimate goal of this SBIR effort is to deliver improvements to existing Fleet electronic warfare support systems by using statistical learning techniques to aid in the classification and unique identification of modern radar emitters. Since software-defined and solid-state emitters do not have the analog features traditionally used for classification, we will use more abstract, but well-defin ...

    SBIR Phase II 2019 Department of DefenseNavy
  9. High Energy/Power Density Li-Ion Battery Capable of Near 0V Storage

    SBC: ADA Technologies, Inc.            Topic: N171046

    Built from a highly successful Phase I (Base) proof-of-concept technology demonstration, ADA Technologies Inc. (ADA) proposes the further development, optimization and demonstration of our energy dense, high power, near zero-volt, storage-capable lithium ion (~0V Li-ion, hereafter) battery technology as a drop-in solution to address Navy energy storage needs. In Phase II, the ~0V Li-ion technology ...

    SBIR Phase II 2019 Department of DefenseNavy
  10. Verification and Optimization of Advanced Finite Element Modeling Techniques for Complex Submarine Hull Structures

    SBC: Magee Technologies, LLC            Topic: N171059

    Phase II Full Proposal for SBIR contract for topic: N171-059Verification and Optimization of Advanced Finite Element Modeling Techniques for Complex Submarine Hull Structures. This NAVSEA Phase II SBIR proposal describes the technical objectives and work plan toward the creation of a manual of finite element modeling(FEM) procedures for complex submarine hull structures, with accuracy validated th ...

    SBIR Phase II 2019 Department of DefenseNavy
US Flag An Official Website of the United States Government