You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Combined Cleaning and Guided Wave Inspection System for Hazardous Liquid Pipelines
SBC: ULC TECHNOLOGIES LLC Topic: 180PH2Pipeline operators employ cleaning tools for improving product throughput, inhibiting corrosion, and preparing their pipes for inline inspection. For many pipeline risk models, improving the scope and quality of input data is a long-term process. If the combined cost of pigging and inspecting was low and could be done simultaneously, pipeline operators would be encouraged to perform inspections mo ...
SBIR Phase II 2019 Department of Transportation -
Synoptic Approach to Harmonize Discrete Data Streams in Application Development
SBC: IT WORKS! INC. Topic: 180NH1Research conducted in Phase I identified a range of data sources providing vehicle related information to consumers shopping around or interested in knowing more about vehicles. Majority of the commercial data sources focused on vehicle features, new/used/CPO pricing, and vehicles listings. Such data sources lacked safety as their central focus, which is a concern for U.S. Department of Transporta ...
SBIR Phase II 2019 Department of Transportation -
DroidChamber
SBC: ATC-NY INC Topic: A15058Warfighters increasingly rely on mobile devices for voice communication, access to information, and execution of apps that aid them in their tasks. However, untrustworthy applications and risky online behaviors can compromise the mobile device. To be secu
SBIR Phase II 2019 Department of DefenseDefense Health Agency -
Next-Generation Adenovirus Vaccine
SBC: TECHNOVAX INC Topic: A150511. Produce AdVLP 55 to address the ongoing epidemic of Adenovirus type 55 causing severe pulmonary infections and death in Asia. 2. Establish analytical methods to monitor in-process production control, characterize the final vaccine product, conduct Ad
SBIR Phase II 2019 Department of DefenseDefense Health Agency -
Fuel Cell Phase I Qualification and UH-1Y Crashworthy Prototypes
SBC: Response Technologies, LLC Topic: DLA182001There are over 123 UH-1Y aircraft in service today, each equipped with five internal fuel cells, with an average cost of $15k per fuel cell. The current supply chain for UH-1Y fuel cells is not able to meet delivery nor quality requirements, which has resulted in a significant force readiness issue. With this SBIR Phase II proposal, Response Technologies (RT) aims to: 1) “Phase I Qualify” a co ...
SBIR Phase II 2019 Department of DefenseDefense Logistics Agency -
Rotorcraft Fuel Bladder Weight and Total Ownership Cost Reduction
SBC: Response Technologies, LLC Topic: DLA182001Response Technologies will attempt to build H-60 fuel cell prototypes and qualify to a portion of MIL-DTL-27422F’s Phase II performance testing criteria [Class B – Semi rigid or self-supporting fuel construction, Type I – Self-sealing, and Protection Level C – Full self-sealing against 50 caliber and partial self-sealing against 14.5 mm] . Response Technologies uses an additive manufacturi ...
SBIR Phase II 2019 Department of DefenseDefense Logistics Agency -
Chronological Sweat Sensor Patch for Real-Time Human Molecular Biomarker Monitoring
SBC: TDA RESEARCH, INC. Topic: DHA18003Sweat contains biomarkers that give an indication of human cognitive levels. In this SBIR project TDA Research is developing a modular sweat sensor patch that has the capability to not only carry out real-time monitoring of select biomarkers, but also to
SBIR Phase II 2019 Department of DefenseDefense Health Agency -
Lightweight, Compact System for Generating Lactated Ringer's Solution
SBC: TDA RESEARCH, INC. Topic: DHA172011Currently, deployed medics are required to transport, maintain and be resupplied with liquid-based medications and materials that are heavy, expensive to transport, perishable and may require refrigeration. Many medications and materials are or will soon
SBIR Phase II 2019 Department of DefenseDefense Health Agency -
MARS Phase II
SBC: ATC-NY INC Topic: DHA172004System maintenance is time consuming, expensive, and can cause extensive downtime if done improperly. To avoid improper system maintenance, extensive training is often required for existing systems, with additional training required for new capabilities b
SBIR Phase II 2019 Department of DefenseDefense Health Agency -
Seamless Flexible Fuel Tanks- 65% TOC Reduction
SBC: Response Technologies, LLC Topic: DLA152001The DoD uses flexible fuel bladders in multiple air, ground, and sea vehicles because they: 1) easily fit into almost any space, 2) are corrosion resistant, and can often be self-sealing and explosion resistant, 3) allow for customized placement of fittings and connection points, and 4) these flexible tanks can collapse as they empty, thereby reducing the need for venting and minimizing sloshing a ...
SBIR Phase II 2016 Department of DefenseDefense Logistics Agency