You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Innovative technologies for nondestructive determination of fracture toughness for pipeline steels in transportation infastructure

    SBC: INNERSPEC TECHNOLOGIES, INC.            Topic: 180PH1

    In the inspection and quality assurance framework, coercimetry refers to non-destructive testing of mechanical properties based on measurements of the magnetic characteristics of a metal. This technology relies on the continuous and noticeable (100-400%) increase in the magnitude of the coercivity, while the metal passes from as-delivered to its final state. As both magnetic and mechanical propert ...

    SBIR Phase II 2019 Department of Transportation
  2. Synoptic Approach to Harmonize Discrete Data Streams in Application Development

    SBC: IT WORKS! INC.            Topic: 180NH1

    Research conducted in Phase I identified a range of data sources providing vehicle related information to consumers shopping around or interested in knowing more about vehicles. Majority of the commercial data sources focused on vehicle features, new/used/CPO pricing, and vehicles listings. Such data sources lacked safety as their central focus, which is a concern for U.S. Department of Transporta ...

    SBIR Phase II 2019 Department of Transportation
  3. Simulating Signal Phase and Timing with an Intersection Collision Avoidance Traffic Model

    SBC: HARMONIA HOLDINGS GROUP, LLC            Topic: 101FH3

    eTEXAS is an integrated traffic and communications simulator developed in cooperation with the US Department of Transportation (USDOT) to support the development of Connected Vehicle (CV) Apps and to perform research on vehicle and roadside Dedicated Short-Range Communication/Wireless Access in Vehicular Environments (DSRC/WAVE) communications using the Society of Automotive Engineers (SAE) standa ...

    SBIR Phase II 2016 Department of Transportation
  4. Driver Fatigue, Distraction, and Alerting Technology

    SBC: Transecurity LLC            Topic: 06FM1

    Transecurity successfully developed a multi-variable drowsy driver mitigation system (DDMS) concept in their SBIR Phase I project. This system combines together many indicators of drowsiness and alertness into a composite drowsiness score. Advisory and warning messages are presented to the driver and supplemental notifications to fleet management are also supported. This Phase II proposal provi ...

    SBIR Phase II 2010 Department of Transportation
  5. LASER GENERATED SURFACE ACOUSTIC WAVES FOR FLAW DETECTION IN TRANSPORTATION SYSTEMS.

    SBC: American Research Corporation of Virginia            Topic: N/A

    TRANSPORTATION SYSTEM STUDIES REQUIRE IN-SERVICE INSPECTION USING NONDESTRUCTIVE EVALUATION (NDE) TECHNIQUES FOR FLAW DETECTION AND CHARACTERIZATION. IN CASES WHERE SUCH DEFECTS ARE SMALL COMPARED WITH THE THICKNESS OF THE SECTION, ULTRASONIC METHODS ARE CONSIDERED TO BE THE MOST SUITABLE. IT WOULD BE IDEAL TO MAKE SUCH MEASUREMENTS REMOTELY WITH A SYSTEM COMBINING THE STRONG FEATURES OF ULTRASONI ...

    SBIR Phase II 1985 Department of Transportation
  6. METHODOLOGY FOR CORRELATION OF ATC CONTROLLER WORKLOAD AND ERRORS

    SBC: Computer Technology Associates            Topic: N/A

    THE PURPOSE OF THIS RESEARCH IS TO STUDY THE FEASIBILITY OF QUANTIFYING THE EFFECTS OF IREASED AUTOMATION ON THE WORKLOAD AND PERFORMANCE OF THE FEDERAL AVIATION ADMINISTRA-TION'S AIR TRAFFIC CONTROLLER. IN PHASE I, RESEARCH WILL FOCUS ON ADAPTRING OUR CURRENT HUMAN PERFORMANCE MODEL TO REPRESENT THE JOB CHARACTERISTICS OR ATTRIBUTES THAT WILL DETERMINE LEVELS OF WORKLOAD AND PERFORMANCE IN THE AD ...

    SBIR Phase II 1987 Department of Transportation
  7. COMPUTER TECHNOLOGY TO EVALUATE AIRCRAFT VORTEX WAKE INTENSITY

    SBC: CONTINUUM DYNAMICS INC            Topic: N/A

    THERE DOES NOT EXIST TODAY A UNIFIED MEANS OF EVALUATING THE VORTEX INTENSITY BEHIND COMMERCIAL JET LINERS PRIOR TO PROTOTYPE DEVELOPMENT AND TESTING AT FULLSCALE. OVER THE PAST SEVERAL YEARS, DATA AND ANALYTICAL DEVELOPMENTS HAVE PROVIDED MUCH ADDITIONAL TECHNOLOGY WHICH MAY MAKE POSSIBLE THE PREDICTION OF WAKE INTENSITY AND DECAY FROM FIRST PRINCIPLES. THE OBJECT OF THIS INVESTIGATION IS TO DEMO ...

    SBIR Phase II 1985 Department of Transportation
  8. RESEARCH ON AN AIRBORNE WIND SHEAR SENSOR

    SBC: Ophir Corporation            Topic: N/A

    THE RECOGNIZED LOW LEVEL WIND SHEAR PHENOMENON KNOWN AS A MICROBURST POSES A SERIOUS AIR SAFETY THREAT TO COMMERCIAL AVIATION WHILE IN A LANDING OR POSES A SERIOUS COMMERCIAL AVIATION WHILE IN A LANDING OR TAKEOFF PATTERN. THIS LOW LEVEL WIND SHEAR HAS BEEN DEMONSTRATED TO DE A THIS LOW LEVEL WIND SHEAR HAS BEEN DEMONSTRATED TO BE A MAJOR CONTRIBUTING FACTOR TO SEVERAL CRASHES OF COMMERCIAL AIRLIN ...

    SBIR Phase II 1987 Department of Transportation
US Flag An Official Website of the United States Government