You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Synoptic Approach to Harmonize Discrete Data Streams in Application Development

    SBC: IT WORKS! INC.            Topic: 180NH1

    Research conducted in Phase I identified a range of data sources providing vehicle related information to consumers shopping around or interested in knowing more about vehicles. Majority of the commercial data sources focused on vehicle features, new/used/CPO pricing, and vehicles listings. Such data sources lacked safety as their central focus, which is a concern for U.S. Department of Transporta ...

    SBIR Phase II 2019 Department of Transportation
  2. Software Package for Material Model Evaluation

    SBC: APTEK, Inc.            Topic: N/A

    This Phase I and II SBIR will develop a user-friendly, run-time efficient software package dedicated to fitting and evaluating material models used in finite element codes like LS-DYNA. The software package will consist of a pre-processor, a core driver, and a post-processor. The pre-processor will allow the user to specify the material model, model parameters, and desired load history. The dri ...

    SBIR Phase II 2004 Department of Transportation
  3. METHODOLOGY FOR CORRELATION OF ATC CONTROLLER WORKLOAD AND ERRORS

    SBC: Computer Technology Associates            Topic: N/A

    THE PURPOSE OF THIS RESEARCH IS TO STUDY THE FEASIBILITY OF QUANTIFYING THE EFFECTS OF IREASED AUTOMATION ON THE WORKLOAD AND PERFORMANCE OF THE FEDERAL AVIATION ADMINISTRA-TION'S AIR TRAFFIC CONTROLLER. IN PHASE I, RESEARCH WILL FOCUS ON ADAPTRING OUR CURRENT HUMAN PERFORMANCE MODEL TO REPRESENT THE JOB CHARACTERISTICS OR ATTRIBUTES THAT WILL DETERMINE LEVELS OF WORKLOAD AND PERFORMANCE IN THE AD ...

    SBIR Phase II 1987 Department of Transportation
  4. LOW COST SMART MAGNETOMETER FOR TRAIN DETECTION/MONITORING

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    PRESENT TRAIN DETECTION SCHEMES RELY LARGELY ON A LOW RESISTANCE THROUGH THE TRAIN'S WHEELS TO PERTURBATE A STABLE ELECTRICAL CIRCUIT. WHILE ELEGANT IN PRINCIPLE, THE DESIGN IS PLAGUED BY OXIDE FILMS AND MATERIAL BUILDUP ON THE RAIL, SNEAK PATHS THROUGH THE BALLAST AND OTHER UNCONTROLLABLE VARIABLES. KVH INDUSTRIES PROPOSES TO DESIGN AND DELIVER A "SMART MAGNETOMETER"-BASED SENSOR PACKAGE WHICH WI ...

    SBIR Phase II 1995 Department of Transportation
  5. RESEARCH ON AN AIRBORNE WIND SHEAR SENSOR

    SBC: Ophir Corporation            Topic: N/A

    THE RECOGNIZED LOW LEVEL WIND SHEAR PHENOMENON KNOWN AS A MICROBURST POSES A SERIOUS AIR SAFETY THREAT TO COMMERCIAL AVIATION WHILE IN A LANDING OR POSES A SERIOUS COMMERCIAL AVIATION WHILE IN A LANDING OR TAKEOFF PATTERN. THIS LOW LEVEL WIND SHEAR HAS BEEN DEMONSTRATED TO DE A THIS LOW LEVEL WIND SHEAR HAS BEEN DEMONSTRATED TO BE A MAJOR CONTRIBUTING FACTOR TO SEVERAL CRASHES OF COMMERCIAL AIRLIN ...

    SBIR Phase II 1987 Department of Transportation
  6. COMPREHENSIVE INTRMODAL FREIGHT TRANSPORTATION VISUAL DATABASE

    SBC: Reebie Associates            Topic: N/A

    THIS PROJECT WILL DEMONSTRATE THE VALUE OF DELIVERING INTERMODAL FREIGHT DATA TO A WIDE VARIETY OF TRANSPORTATION PLANNERS; FEDERAL, STATE, LOCAL AND ULTIMATELY SOME PRIVATE SECTOR USERS. THE PROJECT'S CHALLENGE IS TO MAKE DATA ACCESSIBLE IN TERMS OF THE USER'S ABILITY TO INTERACT WITH VARIOUS SOURCES AND DEPTHS OF INFORMATION AND THE SYSTEM'S ABILITY TO BE TIME RESPONSIVE. THE FACT THAT THE DATA ...

    SBIR Phase II 1995 Department of Transportation
  7. Portland Cement Concrete Pavement Recycling

    SBC: Road Processing Resources Inc.            Topic: N/A

    RPR's Phase I contract proved the feasibility of concrete recycling based o a shock-producing hammer/anvil concept for fracturing and sizing aggregate and separating reinforcing steel into marketable scrap. The Phase II project will develop a portable self-propelled prototype to remove and process a 12 foot wide roadway at a rate of about a mile a day. This is called "Fast Track" highway removal ...

    SBIR Phase II 2004 Department of Transportation
US Flag An Official Website of the United States Government