You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Green Rooftop System for Commercial Buildings with Superior Energy Efficiency

    SBC: XIMAX Technologies Corporation Ltd            Topic: 18NCERP2

    This proposed Small Business Innovative Research (SBIR) Phase II project is to develop, prototype and commercialize a Green Rooftop Technology with superior building energy efficiency to significantly reduce energy consumption of our nation’s industrial and commercial buildings. Besides, this proposed technology can significantly extend the lifespan of current building rooftop materials to ...

    SBIR Phase II 2019 Environmental Protection Agency
  2. Synoptic Approach to Harmonize Discrete Data Streams in Application Development

    SBC: IT WORKS! INC.            Topic: 180NH1

    Research conducted in Phase I identified a range of data sources providing vehicle related information to consumers shopping around or interested in knowing more about vehicles. Majority of the commercial data sources focused on vehicle features, new/used/CPO pricing, and vehicles listings. Such data sources lacked safety as their central focus, which is a concern for U.S. Department of Transporta ...

    SBIR Phase II 2019 Department of Transportation
  3. Targeted Intraceptors for Macular Degeneration

    SBC: Iveena Delivery Systems, Inc.            Topic: NEI

    Project Summary Age-related Macular Degeneration (AMD) is the leading cause of blindness in US. It affects over 25% of the people by the age 80. An estimated 25 million people are afflicted with AMD worldwide. Neovascular or “wet” AMD, which affects 10%–15% of AMD patients, is a rapid form of the disease and progresses to blindness if left untreated. Histopathologically, the disease involves ...

    SBIR Phase II 2019 Department of Health and Human ServicesNational Institutes of Health
  4. Development of Serious Games and Physical Activities Instructed by a Social Robot for Improving the Well-being of Elderly Individuals with Alzheimer's Disease and Dementia

    SBC: Dream Face Technologies, LLC            Topic: NIA

    The objective of the proposed direct Phase-II SBIR project is to develop and study and the effectiveness of Serious Games and physical Activities played/performed by elderly people with Alzheimer’s disease and AD- related Dementias in interaction with Ryan, our successfully piloted Socially Assistive Robot (SAR). Ryan is an intelligent conversational life-like social robot, designed to improve t ...

    SBIR Phase II 2019 Department of Health and Human ServicesNational Institutes of Health
  5. Electro-Magnetic Interference Composite Rigid Wall Shelter (EMI CRWS)

    SBC: Conductive Composites Company, L.L.C.            Topic: N172103

    Rigid Wall Shelters (RWS) are an integral building block for Marine Corp operations and support a multitude of operational needs from maintenance and repair operations to command posts and medical operations. There are several critical operational deficiencies with metal RWS. The weight of legacy systems and lack of insulation result in a high cost to transport and difficulty heating and cooling i ...

    SBIR Phase II 2019 Department of DefenseNavy
  6. Missile Motor Cutting Technology

    SBC: Gordon Aerospace and Defence, LLC            Topic: AF181007

    Dissecting missile motors for the analysis of the chemical and physical properties of the propellant is indeed an inherently dangerous process. Ignition of the propellant during the dissection process would surely result in the catastrophic loss of facility and personnel. The process of dissection must perform with a bare minimum of well understood, monitored and managed risk factors all while max ...

    SBIR Phase II 2019 Department of DefenseAir Force
  7. Additive Manufacturing for Naval Aviation Battery Applications

    SBC: STORAGENERGY TECHNOLOGIES INC            Topic: N18AT008

    The objective of the efforts being proposed is to develop high energy density and power density batteries with long cycle life by high-speed additive manufacturing technologies.

    STTR Phase II 2019 Department of DefenseNavy
  8. Eliminating Adverse Impact of Copper Contamination in Jet Propellant 5 (JP-5) Fuel

    SBC: TDA RESEARCH, INC.            Topic: N181071

    As jet fuel flows through the CuNi fuel lines in aircraft fueling systems, copper (Cu) is dissolved into the fuel. The Cu contamination can reach up to 1 ppmw and these contaminants could catalyze oxidation reactions that cause hydrocarbons to decompose to elemental carbon and form deposits on the fuel lines, valves, injectors, and engine combustion chamber surfaces.TDA Research, Inc. (TDA) propos ...

    SBIR Phase II 2019 Department of DefenseNavy
  9. Combat System Automation Management

    SBC: STILMAN ADVANCED STRATEGIES, LLC            Topic: N03202

    STILMAN’s Linguistic Geometry, Real-time Adversarial Intelligence and Decision-making (LG-RAID) Technology has been developed with extensive support from DARPA, NAVSEA and Department of Defense stakeholders. NAVSEA PEO IWS 1.0 desires to adapt, test, validate and transition this novel, innovative technology to accelerate tactical mission planning within complex strategic and tactical environment ...

    SBIR Phase II 2019 Department of DefenseNavy
  10. Miniature 3D Dome Radar to Counter Small Unmanned Aircraft Systems (sUAS)

    SBC: SpotterRF LLC            Topic: AF191D002

    The objective is to develop and test a functional prototype of a 3D Dome radar with full hemispherical coverage (0-90 degrees vertical and 360 degree horizontal). This prototype shall have an update rate of 1 Hz, a tracking range of 2 km that weighs less than 12 kg and an estimated cost of close to $150,000. SpotterRF shall test the 3D radar to determine its tracking range against a DJI Phantom 4 ...

    SBIR Phase II 2019 Department of DefenseAir Force
US Flag An Official Website of the United States Government