You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Synoptic Approach to Harmonize Discrete Data Streams in Application Development
SBC: IT WORKS! INC. Topic: 180NH1Research conducted in Phase I identified a range of data sources providing vehicle related information to consumers shopping around or interested in knowing more about vehicles. Majority of the commercial data sources focused on vehicle features, new/used/CPO pricing, and vehicles listings. Such data sources lacked safety as their central focus, which is a concern for U.S. Department of Transporta ...
SBIR Phase II 2019 Department of Transportation -
Human Attributes & Behaviors Influencing Troubled Software (HABITS)
SBC: STAR LAB CORP. Topic: SB172007Developing secure software is notoriously difficult, partially evidenced by the increasing trend in vulnerabilities disclosed per year. While significant effort has gone into developing tools and automated test frameworks, human behavioral aspects of the software development process have remained relatively unexplored. These behavioral aspects, such as relying on inexperienced developers or prolon ...
SBIR Phase II 2019 Department of DefenseDefense Advanced Research Projects Agency -
Rotorcraft Fuel Bladder Weight and Total Ownership Cost Reduction
SBC: Response Technologies, LLC Topic: DLA182001Response Technologies will attempt to build H-60 fuel cell prototypes and qualify to a portion of MIL-DTL-27422F’s Phase II performance testing criteria [Class B – Semi rigid or self-supporting fuel construction, Type I – Self-sealing, and Protection Level C – Full self-sealing against 50 caliber and partial self-sealing against 14.5 mm] . Response Technologies uses an additive manufacturi ...
SBIR Phase II 2019 Department of DefenseDefense Logistics Agency -
Fuel Cell Phase I Qualification and UH-1Y Crashworthy Prototypes
SBC: Response Technologies, LLC Topic: DLA182001There are over 123 UH-1Y aircraft in service today, each equipped with five internal fuel cells, with an average cost of $15k per fuel cell. The current supply chain for UH-1Y fuel cells is not able to meet delivery nor quality requirements, which has resulted in a significant force readiness issue. With this SBIR Phase II proposal, Response Technologies (RT) aims to: 1) “Phase I Qualify” a co ...
SBIR Phase II 2019 Department of DefenseDefense Logistics Agency -
Seamless Flexible Fuel Tanks- 65% TOC Reduction
SBC: Response Technologies, LLC Topic: DLA152001The DoD uses flexible fuel bladders in multiple air, ground, and sea vehicles because they: 1) easily fit into almost any space, 2) are corrosion resistant, and can often be self-sealing and explosion resistant, 3) allow for customized placement of fittings and connection points, and 4) these flexible tanks can collapse as they empty, thereby reducing the need for venting and minimizing sloshing a ...
SBIR Phase II 2016 Department of DefenseDefense Logistics Agency -
Low Cost Expendable Launch Technology
SBC: T.G.V. ROCKETS INC. Topic: SB152008A high performance low cost upper stage and demonstration of a low cost engine with a recurring cost of $1 million delivered cost.
SBIR Phase II 2016 Department of DefenseDefense Advanced Research Projects Agency