You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Synoptic Approach to Harmonize Discrete Data Streams in Application Development

    SBC: IT WORKS! INC.            Topic: 180NH1

    Research conducted in Phase I identified a range of data sources providing vehicle related information to consumers shopping around or interested in knowing more about vehicles. Majority of the commercial data sources focused on vehicle features, new/used/CPO pricing, and vehicles listings. Such data sources lacked safety as their central focus, which is a concern for U.S. Department of Transporta ...

    SBIR Phase II 2019 Department of Transportation
  2. Rotorcraft Fuel Bladder Weight and Total Ownership Cost Reduction

    SBC: Response Technologies, LLC            Topic: DLA182001

    Response Technologies will attempt to build H-60 fuel cell prototypes and qualify to a portion of MIL-DTL-27422F’s Phase II performance testing criteria [Class B – Semi rigid or self-supporting fuel construction, Type I – Self-sealing, and Protection Level C – Full self-sealing against 50 caliber and partial self-sealing against 14.5 mm] . Response Technologies uses an additive manufacturi ...

    SBIR Phase II 2019 Department of DefenseDefense Logistics Agency
  3. Fuel Cell Phase I Qualification and UH-1Y Crashworthy Prototypes

    SBC: Response Technologies, LLC            Topic: DLA182001

    There are over 123 UH-1Y aircraft in service today, each equipped with five internal fuel cells, with an average cost of $15k per fuel cell. The current supply chain for UH-1Y fuel cells is not able to meet delivery nor quality requirements, which has resulted in a significant force readiness issue. With this SBIR Phase II proposal, Response Technologies (RT) aims to: 1) “Phase I Qualify” a co ...

    SBIR Phase II 2019 Department of DefenseDefense Logistics Agency
  4. Seamless Flexible Fuel Tanks- 65% TOC Reduction

    SBC: Response Technologies, LLC            Topic: DLA152001

    The DoD uses flexible fuel bladders in multiple air, ground, and sea vehicles because they: 1) easily fit into almost any space, 2) are corrosion resistant, and can often be self-sealing and explosion resistant, 3) allow for customized placement of fittings and connection points, and 4) these flexible tanks can collapse as they empty, thereby reducing the need for venting and minimizing sloshing a ...

    SBIR Phase II 2016 Department of DefenseDefense Logistics Agency
  5. Imaging Instrumentation System

    SBC: DBV TECHNOLOGY, LLC            Topic: N08199

    There are two main objectives of the follow-on Phase II for Small Business Innovation Research Topic N08-199.First is to deliver a portable Splash Impact Measurement System (SIMS) with capablility of mapping the debris field surrounding an engagement event in broad ocean areas.This mapping will provide the precise location and time of all objects impacting the sea surface.The second objective is t ...

    SBIR Phase II 2016 Department of DefenseMissile Defense Agency
  6. A Framework for an Optimal and Adaptive BMDS Firing Doctrine

    SBC: CARDINAL SYSTEMS & ANALYSIS, INC.            Topic: MDA02017

    The BMDS is being developed as a fully integrated, layered defense capable of defending against all ranges of threats. A critical aspect of this development is an integrated approach to interceptor allocation. A model-based framework for optimizing multi-layer BMDS performance, developing interceptor firing doctrine, and providing for adaptive, real-time interceptor allocation was developed in P ...

    SBIR Phase II 2004 Department of DefenseMissile Defense Agency
  7. CURRENT ECONOMIC AND DEMOGRAPHIC ESTIMATES FOR COUNTRIES (CEDEC)

    SBC: Mcginess & Williams Dual Comm            Topic: N/A

    RESEARCH TO DETERMINE IF ECONOMIC AND DEMOGRAPHIC DATA WHICH ARE AVAILABLE FOR COUNTIES ON A REASONABLY CURRENT BASIS ARE VALID. THE RELATIONSHIPS BETWEEN ECONOMIC AND DEMOGRAPHIC DATA WHICH ARE AVAILABLE ON A CURRENT BASIS FOR COUNTIES WILL BE COMPARED FOR RECENT YEARS WITH REFERENCE DATA FROM ESTABLISHED STATISTICAL AND ADMINISTRATIVE RECORD RESOURCES. IF THE CURRENT ESTIMATES ARE RELIABLE FOR S ...

    SBIR Phase II 1985 Department of Agriculture
US Flag An Official Website of the United States Government