You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Synoptic Approach to Harmonize Discrete Data Streams in Application Development

    SBC: IT WORKS! INC.            Topic: 180NH1

    Research conducted in Phase I identified a range of data sources providing vehicle related information to consumers shopping around or interested in knowing more about vehicles. Majority of the commercial data sources focused on vehicle features, new/used/CPO pricing, and vehicles listings. Such data sources lacked safety as their central focus, which is a concern for U.S. Department of Transporta ...

    SBIR Phase II 2019 Department of Transportation
  2. Multi-Object Payload Deployment

    SBC: SEACORP, LLC            Topic: MDA15018

    Technological advances have facilitated weapons systems capable of simultaneously supporting multiple missions leading to cost efficiencies and greater operational flexibility.Future systems capable of deploying multiple payloads from a single missile will enable various targets to be attacked with a single launch allowing more efficient use of limited and valuable resources.For such a system to w ...

    SBIR Phase I 2016 Department of DefenseMissile Defense Agency
  3. Imaging Instrumentation System

    SBC: DBV TECHNOLOGY, LLC            Topic: N08199

    There are two main objectives of the follow-on Phase II for Small Business Innovation Research Topic N08-199.First is to deliver a portable Splash Impact Measurement System (SIMS) with capablility of mapping the debris field surrounding an engagement event in broad ocean areas.This mapping will provide the precise location and time of all objects impacting the sea surface.The second objective is t ...

    SBIR Phase II 2016 Department of DefenseMissile Defense Agency
  4. A Framework for an Optimal and Adaptive BMDS Firing Doctrine

    SBC: CARDINAL SYSTEMS & ANALYSIS, INC.            Topic: MDA02017

    The BMDS is being developed as a fully integrated, layered defense capable of defending against all ranges of threats. A critical aspect of this development is an integrated approach to interceptor allocation. A model-based framework for optimizing multi-layer BMDS performance, developing interceptor firing doctrine, and providing for adaptive, real-time interceptor allocation was developed in P ...

    SBIR Phase II 2004 Department of DefenseMissile Defense Agency
  5. Property-Based Hierarchy Construction and Unified Missile Defense Ontology

    SBC: STREAMSAGE            Topic: MDA04043

    Technologies in the field of information retrieval, knowledge management, and communication technology currently face fundamental barriers, particularly in knowledge resource generation and machine language understanding, denying government and industry access to critical information resources. StreamSage proposes to solve these problems with its Property-Based Hierarchy Construction system, the f ...

    SBIR Phase I 2004 Department of DefenseMissile Defense Agency
  6. Battle Management/Command and Control System Performance Simulator

    SBC: TESLA LABORATORIES, INC.            Topic: MDA04020

    This proposed program seeks to develop, demonstrate, and commercialize a versatile new computer modeling approach for simulating and predicting the Battle Management, Command, Control, Computers and Communications (BMC4) operation and performance for the Ballistic Missile Defense System currently under development by the Missile Defense Agency. It will model BMC4 network performance by: 1.) model ...

    SBIR Phase I 2004 Department of DefenseMissile Defense Agency
  7. ELECTRONIC GAAS-ON-SILICON MATERIAL FOR ADVANCED HIGH-SPEED OPTOELECTRONIC DEVICES

    SBC: ASTROPOWER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseMissile Defense Agency
  8. URBAN TRANSIT COST RECOVERY FEASIBILITY STUDY

    SBC: Williams-kuebelbeck & Assc Inc            Topic: N/A

    URBAN TRANSIT IMPROVEMENTS ENHANCE THE VALUE OF THE PROPERTY THEY SERVE. TRADITIONAL URBAN TRANSIT FINANCING TECHNIQUES NEGLECT THIS POTENTIAL SOURCE OF REVENUE. BENEFIT ASSESSMENT DISTRICTS AND IMPACT MITIGATION FEES, BASED ON CONCEPTS ORIGINALLY DEVISED FOR MINOR IMPROVEMENTS (EG. SIDEWALKS), HAVE BEEN APPLIED EXPERIMENTALLY TO URBAN TRANSIT, BUT DO NOT GENERATE THE MAJOR FUNDING URBAN TRANSIT R ...

    SBIR Phase I 1987 Department of Transportation
  9. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    A SIX MONTH PROGRAM TO DEVELOP A RUGGED NEW DEVICE FOR MONITORING THE ONSET OF ICE FORMATION ON SURFACES OF TRANSPORTATION VEHICLES, ROADS, BRIDGES AND AIRCRAFTS, WILL BE DEVELOPED AND A PROTOTYPE WILL BE LABORATORY TESTED. THE NOVEL GAGE AND ELECTRONIC SYSTEM IS PARTLY BASED ON THE TECHNOLOGY APPLIED TO MEASURE CONDUCTIVITY OF SOLUTIONS. BASED ON EXISTING TECHNOLOGY, AND ALREADY TESTED UNDER HIGH ...

    SBIR Phase II 1985 Department of Transportation
US Flag An Official Website of the United States Government