You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Synoptic Approach to Harmonize Discrete Data Streams in Application Development

    SBC: IT WORKS! INC.            Topic: 180NH1

    Research conducted in Phase I identified a range of data sources providing vehicle related information to consumers shopping around or interested in knowing more about vehicles. Majority of the commercial data sources focused on vehicle features, new/used/CPO pricing, and vehicles listings. Such data sources lacked safety as their central focus, which is a concern for U.S. Department of Transporta ...

    SBIR Phase II 2019 Department of Transportation
  2. Rotorcraft Fuel Bladder Weight and Total Ownership Cost Reduction

    SBC: Response Technologies, LLC            Topic: DLA182001

    Response Technologies will attempt to build H-60 fuel cell prototypes and qualify to a portion of MIL-DTL-27422F’s Phase II performance testing criteria [Class B – Semi rigid or self-supporting fuel construction, Type I – Self-sealing, and Protection Level C – Full self-sealing against 50 caliber and partial self-sealing against 14.5 mm] . Response Technologies uses an additive manufacturi ...

    SBIR Phase II 2019 Department of DefenseDefense Logistics Agency
  3. Fuel Cell Phase I Qualification and UH-1Y Crashworthy Prototypes

    SBC: Response Technologies, LLC            Topic: DLA182001

    There are over 123 UH-1Y aircraft in service today, each equipped with five internal fuel cells, with an average cost of $15k per fuel cell. The current supply chain for UH-1Y fuel cells is not able to meet delivery nor quality requirements, which has resulted in a significant force readiness issue. With this SBIR Phase II proposal, Response Technologies (RT) aims to: 1) “Phase I Qualify” a co ...

    SBIR Phase II 2019 Department of DefenseDefense Logistics Agency
  4. Seamless Flexible Fuel Tanks- 65% TOC Reduction

    SBC: Response Technologies, LLC            Topic: DLA152001

    The DoD uses flexible fuel bladders in multiple air, ground, and sea vehicles because they: 1) easily fit into almost any space, 2) are corrosion resistant, and can often be self-sealing and explosion resistant, 3) allow for customized placement of fittings and connection points, and 4) these flexible tanks can collapse as they empty, thereby reducing the need for venting and minimizing sloshing a ...

    SBIR Phase II 2016 Department of DefenseDefense Logistics Agency
  5. RESEARCH AND DEVELOPMENT OF AUDIO, VISUAL AND PRINTED MATERIALS FOR EMS PERSONNEL

    SBC: Association Management & Cons.            Topic: N/A

    ASSOCIATION MANAGEMENT AND CONSULTATION, INC.(AMC) PROPOSES TO CONDUCT AN ANALYSIS OF THE ACTUAL AND PERCEIVED AUDIO VISUAL NEEDS OF EMERGENCY MEDICAL SERVICES (EMS) PROVIDERS IN THEIR NETWORKING EFFORTS WHICH CURRENTLY REVOLVE AROUND ACURRICULUM ENTITLED "OCCUPANT SAFETY SYSTEMS, LESSON PLANS AND INSTRUCTOR GUIDE FOR EMS PERSONNEL". WHILE THE CURRICULUM AND THE STRATEGIES WHICH IT DETAILS HAVE ME ...

    SBIR Phase II 1987 Department of Transportation
US Flag An Official Website of the United States Government