You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
On-board Smart Vision System to Support Vehicle-to-Infrastructure (V2I) Communication
SBC: Connected Wise LLC Topic: 180FH1Connected automated vehicle (CAV) technology has significant implications in terms of transportation system safety and efficiency. However, building and maintaining a wireless communication infrastructure (e.g. roadside units (RSUs), power, fiber optic lines etc.) across the U.S. is a challenging task. In urban areas, where vehicle population and vehicle-miles-traveled (VMT) are high, building suc ...
SBIR Phase II 2019 Department of Transportation -
Synoptic Approach to Harmonize Discrete Data Streams in Application Development
SBC: IT WORKS! INC. Topic: 180NH1Research conducted in Phase I identified a range of data sources providing vehicle related information to consumers shopping around or interested in knowing more about vehicles. Majority of the commercial data sources focused on vehicle features, new/used/CPO pricing, and vehicles listings. Such data sources lacked safety as their central focus, which is a concern for U.S. Department of Transporta ...
SBIR Phase II 2019 Department of Transportation -
Guided Augmented Independence Travel Aid (GAIT-Aid)
SBC: Design Interactive, Inc. Topic: 180FT1Lack of transportation access affects approximately 30% of people with functional limitations. In fact, people with functional limitations experience transportation access barriers four times more than those without limitations. With the emerging market of low cost augmented and virtual reality technology, perceptual user interfaces (PUI) that interact more naturalistically with end-users are prov ...
SBIR Phase II 2019 Department of Transportation -
Low Cost Transverse Rail Defect Detector
SBC: WavesinSolids LLC Topic: N/AThis project will use an ultrasonic beam traveling logitudinally along the rail rather than the complex normal and angle-beams transducer assemblies in current systems. Detectio of transverse defects becomes a simple pulse-echo application and resolves many inherent speed, inspectin reliability and robustness problems in current rail inspection systems. The simplified procedure will increase the r ...
SBIR Phase II 2004 Department of Transportation -
RESEARCH AND DEVELOPMENT OF AUDIO, VISUAL AND PRINTED MATERIALS FOR EMS PERSONNEL
SBC: Association Management & Cons. Topic: N/AASSOCIATION MANAGEMENT AND CONSULTATION, INC.(AMC) PROPOSES TO CONDUCT AN ANALYSIS OF THE ACTUAL AND PERCEIVED AUDIO VISUAL NEEDS OF EMERGENCY MEDICAL SERVICES (EMS) PROVIDERS IN THEIR NETWORKING EFFORTS WHICH CURRENTLY REVOLVE AROUND ACURRICULUM ENTITLED "OCCUPANT SAFETY SYSTEMS, LESSON PLANS AND INSTRUCTOR GUIDE FOR EMS PERSONNEL". WHILE THE CURRICULUM AND THE STRATEGIES WHICH IT DETAILS HAVE ME ...
SBIR Phase II 1987 Department of Transportation