You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Combined Cleaning and Guided Wave Inspection System for Hazardous Liquid Pipelines
SBC: ULC TECHNOLOGIES LLC Topic: 180PH2Pipeline operators employ cleaning tools for improving product throughput, inhibiting corrosion, and preparing their pipes for inline inspection. For many pipeline risk models, improving the scope and quality of input data is a long-term process. If the combined cost of pigging and inspecting was low and could be done simultaneously, pipeline operators would be encouraged to perform inspections mo ...
SBIR Phase II 2019 Department of Transportation -
Synoptic Approach to Harmonize Discrete Data Streams in Application Development
SBC: IT WORKS! INC. Topic: 180NH1Research conducted in Phase I identified a range of data sources providing vehicle related information to consumers shopping around or interested in knowing more about vehicles. Majority of the commercial data sources focused on vehicle features, new/used/CPO pricing, and vehicles listings. Such data sources lacked safety as their central focus, which is a concern for U.S. Department of Transporta ...
SBIR Phase II 2019 Department of Transportation -
Environmentally Neutral Electric Bike Share System
SBC: INNOVATIVE DYNAMICS INC. Topic: 142OS1IDI is proposing an electrically assisted e-bike system, designed to increase the usage of bicycles for daily commuting. This design is intended for usage alongside traditional bike share programs in cities across the country. The primary benefit is attract those otherwise unwilling to use bicycles to commute, either due to personal reservation or perceived terrain difficulties. This is accomplish ...
SBIR Phase II 2016 Department of Transportation -
IMPROVEMENT OF AIR VOID ANALYSIS OF FRESH CONCRETE
SBC: Technical Innovations Topic: N/AWE WILL DETERMINE THE FEASIBILITY OF IMPROVED METHODS FOR DETERMING AIR CONTENT IN FRESH CONCRETE. WE EXPECT THAT A STUDY OF VOLUME CHANGE WITH VARYING PRESSURE AND VACUUM WILL LEAD TO A METHOD THAT WILL INDICATE BOTH AIR CONTENT AND VOID SIZE, AND YIELD AIR CONTENTS THAT T ARE UNAFFECTED BY THE NONTHEORETICAL COMPRESSIBILITY OF SMALL VOIDS. WE WILL DETERMINE THE FEACIBILITY OF SIMPLER METHODS OF ...
SBIR Phase II 1987 Department of Transportation