You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Rapid Repair of Corroded Fastener Holes

    SBC: VRC Metal Systems, LLC            Topic: N192085

    x

    SBIR Phase I 2019 Department of DefenseNavy
  2. Advanced Manufacturing Technologies

    SBC: ONTO TECHNOLOGY, LLC            Topic: DLA152001

    This Phase II Small Business Innovation Research project develops the scale of lithium-ion direct recycling technologies applied to gain efficiencies in materials management from original manufacturing to end-of-life. The scrap materials are from Defense Logistics Agency manufacturing activities. A successful effort moves direct recycle TRL from 4 to 6, increases process throughput, qualifies mate ...

    SBIR Phase II 2019 Department of DefenseDefense Logistics Agency
  3. Flexible High-Dynamic-Range Lidar Digitizer

    SBC: VOXTEL, INC.            Topic: N192063

    To meet the U.S. Navy need for high-dynamic-range digitizers for lidar applications, a four-input channel 17-bit dynamic-range application-specific integrated circuit (ASIC) will be developed. Each of the four high-bandwidth input channels will be configured in a fast-in/slow-out architecture, composed of a stacked 512-element switched capacitor array (SCA), capable of 2-ns time-slice sampling, an ...

    SBIR Phase I 2019 Department of DefenseNavy
  4. Power Factor Correction

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: N181005

    The primary objective of this Phase II proposal is to further develop and demonstrate a lightweight passive power factor compensation unit utilizing advanced high-temperature magnetic materials and design techniques to achieve power quality improvement for a 65 kVA, 115V, 400-Hz aircraft power system. Based on identified system problems in the F-18 Super Hornet platform, the compensation system mu ...

    SBIR Phase II 2019 Department of DefenseNavy
  5. A Modular Cluster Tool for Semiconductor Failure Analysis

    SBC: Square One Systems Design, Inc.            Topic: DMEA172001

    Advanced semiconductor devices form the heart of 21st Century technologies. The mission-critical role that these devices play demands exceptional levels of reliability. When a semiconductor device does fail, it is essential that the cause of the failure is identified as quickly as possible, Because of the daunting complexity of an integrated circuit, a significant amount of intricate material rem ...

    SBIR Phase II 2019 Department of DefenseDefense Microelectronics Activity
  6. Collaborative Recommender System for Spatio-Temporal Intelligence Documents

    SBC: RAJI BASKARAN LLC            Topic: NGA191005

    NLP pipelines available today are getting robust for general language modeling purposes. But domain-specific data, abbreviations and lingos, and text about time or space still need a lot of tuning and training that are well beyond application of standard tool sets. Deep learning for recommendation engines is quite new, and all recommender systems, in particular for specially trained users, tend to ...

    SBIR Phase I 2019 Department of DefenseNational Geospatial-Intelligence Agency
  7. Prime Power System Development for Active Denial Technology (ADT) and High-Power Radio-Frequency (RF) Systems

    SBC: CANDENT TECHNOLOGIES INCORPORATED            Topic: N132086

    Solid state RF and millimeter wave weapons systems require substantial power to operate. Pure solid state systems have limited energy density and require charging over the typical use cycle. The directed energy system must be compact enough to mount on a vehicle such as a HMMWV, a small trailer or a structure such as found within an embassy compound. Current power systems are much too large and he ...

    SBIR Phase II 2019 Department of DefenseNavy
  8. Open Call for Innovative Defense-Related Dual-Purpose Technologies with a Clear USAF Need- Gearbox PEDP

    SBC: IBC Materials & Technologies, LLC            Topic: AF192001

    Secondary power system components such as gearboxes are de-painted each year as part of routine maintenance, repair and overhaul (MRO) activities. Current paint removal processes current process for paint removal involves soaking the parts in a toxic chemical solvent, followed by media blasting. The chemicals and blast media are expensive, and the time required to complete a depainting operation w ...

    SBIR Phase I 2019 Department of DefenseAir Force
  9. Open Call for Innovative Defense-Related Dual-Purpose Technologies/Solutions with a Clear Air Force Stakeholder Need

    SBC: Adranos Inc            Topic: AF192001

    Adranos has developed the capability to extend the range and payload capacity of hypersonic weapons and increase the payload capacity of space launch systems through its high-performance solid rocket propellant called ALITEC. This capability can give the US a critical competitive advantage through range overmatch with hypersonics and through a lower cost per kilogram launched in a space launch veh ...

    SBIR Phase I 2019 Department of DefenseAir Force
  10. Temporary Crack Repairs for Aluminum Structures on Surface Ships

    SBC: VRC Metal Systems, LLC            Topic: N151052

    The following tasks are to be executed by the contractor in support of NAVAIR Materials Engineering Division AIR 4.3.4 and NAVSEA 04X3 Tactical Innovation Implementation Laboratory (TIIL). These tasks are in support of evaluating high pressure cold spray technology for the repair of A356 and E357 cast components, allowing the dimensional restoration and return to service of the components. The tas ...

    SBIR Phase II 2019 Department of DefenseNavy
US Flag An Official Website of the United States Government