You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Lightweight Gearbox for Air Cushion Vehicles

    SBC: Pratt & Miller Engineering & Fabrication, LLC            Topic: N181072

    The Re-Designed Lightweight Gearbox

    SBIR Phase II 2019 Department of DefenseNavy
  2. Rapid Repair of Corroded Fastener Holes

    SBC: VRC Metal Systems, LLC            Topic: N192085

    x

    SBIR Phase I 2019 Department of DefenseNavy
  3. CLEAR (ContextuaL Explanation And Reasoning)

    SBC: SOAR TECHNOLOGY INC            Topic: AF191022

    In response to SBIR solicitation AF191-022, entitled “Improving Transparency of Object Tracking Technology for RPA Sensor Operatorâ€Â, SoarTech, teamed with operational SMEs at UAS Consulting Group propose to develop CLEAR (ContextuaL Explanation And Reasoning), an intelligent transparency tool which will improve automated object tracker transparency with the goal of development of cal ...

    SBIR Phase I 2019 Department of DefenseAir Force
  4. Open Architecture Control Systems for Small Engine Air Force Applications

    SBC: NEW EAGLE CONSULTING LLC            Topic: AF192001

    Current US Air Force small propulsion and power control systems are often unreliable and employ closed architectures that lack scalability, leading to lengthy and costly modifications when changes or upgrades are needed by the warfighter. The problem is caused by application specific design, slow software development practices, and custom hardware. In addition, current UAS/SUAS and cruise missile ...

    SBIR Phase I 2019 Department of DefenseAir Force
  5. Hypersonic SimBuilderâ„¢

    SBC: FAAC INCORPORATED            Topic: AF192001

    Although tactics in the air-to-air arena continually evolve, the foundational displays that present the weapon capability via the fire control PVI/HMI have become well established. Hypersonic weapons however, present new capabilities, and the associated fire control PVI/HMI should reflect those capabilities. Furthermore, by their very nature, hypersonic weapons blur the boundary between the tactic ...

    SBIR Phase I 2019 Department of DefenseAir Force
  6. In-Process Cure Monitoring of Specialty Material Coatings

    SBC: TeraMetrix, LLC            Topic: AF071117

    TeraMetrix proposes a SBIR STTP CRP project to perform all of the development, on-aircraft validation and transition planning tasks to implement an automated robotic non-contact time-domain terahertz (THz) specialty coating thickness inspection for the F-22 inlet ducts. The proposed THz measurement system will utilize existing spray robots to automatically position the THz sensor, replacing a slow ...

    SBIR Phase II 2019 Department of DefenseAir Force
  7. Direct to Phase II Open Topic: Open Call for Innovative Defense-Related Dual-Purpose Technologies/Solutions with a Clear Air Force Stakeholder Need

    SBC: COMPETING VALUES, LLC            Topic: AF192D001

    The USAF needs to develop a lethal and ready force full of innovation-minded Airmen. It needs to create its innovation culture, develop its innovation competency, and cultivate innovation communities that sustain and perpetuate the innovation practices into the future. Based on more than 25 years of research and practice, the Competing Values® LLC/ Innovatrium® LLC (“Innovatrium†...

    SBIR Phase II 2019 Department of DefenseAir Force
  8. Automated, Rapid Non-Destructive Inspection (NDI) of Large Scale Composite Structures

    SBC: THERMAL WAVE IMAGING INC            Topic: N092097

    Phase II.5 proposal, an extension of Phase II contract N092-097. In the previous Phase II program, TWI demonstrated that Large Standoff / Large Area Thermography (LASLAT) can successfully be applied to Nondestructive Inspection (NDI) of composite aircraft structures. The method employed was based on optical excitation using a novel projector and signal processing developed by TWI. Capability was d ...

    SBIR Phase II 2019 Department of DefenseNavy
  9. Temporary Crack Repairs for Aluminum Structures on Surface Ships

    SBC: VRC Metal Systems, LLC            Topic: N151052

    The following tasks are to be executed by the contractor in support of NAVAIR Materials Engineering Division AIR 4.3.4 and NAVSEA 04X3 Tactical Innovation Implementation Laboratory (TIIL). These tasks are in support of evaluating high pressure cold spray technology for the repair of A356 and E357 cast components, allowing the dimensional restoration and return to service of the components. The tas ...

    SBIR Phase II 2019 Department of DefenseNavy
  10. Peregrine Ph II

    SBC: SOAR TECHNOLOGY INC            Topic: N181015

    SoarTech, Forward Slope, and Capt. Brian Donegan (US Navy, Retired), will develop Peregrine, a robust, ready to transition, 4D overlay generation capability. Peregrine will develop software services ready for Fleet Exercise (FLEX) exerperimentation and transition to the JMPS Multi-Vehicle Planner. Peregrine will provide air planners with services that (1) connect to, synchronize, and transform dyn ...

    SBIR Phase II 2019 Department of DefenseNavy
US Flag An Official Website of the United States Government