You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SCALABLE DIRECT ACCESS FRAME BUFFER

    SBC: Access Dynamics, Inc.            Topic: N/A

    CURRENT FRAME BUFFER TECHNOLOGY IS NOT OPTIMIZED FOR USE WITH GENERAL PURPOSE PROCESSORS. THIS PROPOSAL IS FOR A PROGRAM TO DEVELOP A BREADBOARD FRAME BUFFER WHICH IS EFFICIENTLY ACCESSED BY SUCH PROCESSORS. THE FRAME BUFFER IS BASED ON THE VME BUS AND IS SCALABLE TO LARGE AMOUNTS OF IMAGE MEMORY AND VERY FAST IMAGE ACQUISITION RATES. ALL IMAGE DATA IS RANDOMLY ACCESSIBLE AT HIGH SPEED. ANTICIPATE ...

    SBIR Phase I 1992 Department of DefenseDefense Advanced Research Projects Agency
  2. COST REDUCTION DESIGNS OF A LARGE RANGE OF HIGH PERFORMANCE PM ALTERNATORS AND CONTROLS WITH A PARALLEL EMPHASIS ON...

    SBC: Active Technologies Inc.            Topic: N/A

    FOUR BEARINGLESS, SHAFT MOUNTED GENERATORS WITH OUTPUTS OF 10, 100, 500 AND 1000 WATTS OF 12-15 V DC WILL BE DESIGNED AND COMPUTER MODELED TO BE DRIVEN BY MODEL AIRPLANE SIZE RECIPROCATING ENGINES. DESIGN COMBINATIONS OF IRONLESS DISK AND IRON LAMINATION CYLINDRICAL GENERATORS USING RARE EARTH AND CERAMIC PERMANENT MAGNETS WILL BE MODELED FOR RELIABILITY WITH THE LOWEST WEIGHT AT THE HIGHEST EFFIC ...

    SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency
  3. STANDOFF MINE DETECTOR

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseDefense Advanced Research Projects Agency
  4. VARIATIONAL EVALUATION OF EM COUPLING TO A WIRE INSIDE A CAVITY

    SBC: Applied Physics Technologies            Topic: N/A

    CONTRACTOR WILL DEVELOP A LAGRANGIAN FORMULATION FOR THE ELECTROMAGNETIC RESPONSE OF A METALLIC ENCLOSURE WITH THIN, SLIGHTLY DIFFUSIVE WALLS AND A WIRE SPANNING THE ENCLOSURE. CONTRACTOR WILL FIRST DERIVE A LAGRANGIAN OPERATOR ON THE FIELDS WHICH IS STATIONARY WHEN MAXWELL'S EQUATIONS ARE SATISFIED. THE LAGRANGIAN WILL THEN BE USED TO DETERMINE THE ENCLOSURE EIGENMODES (WIRE INCLUDED) AND THE AMP ...

    SBIR Phase I 1987 Department of DefenseArmy
  5. EMP ENVIRONMENT PREDICTION FOR COLLIMATED SOURCES

    SBC: Applied Physics Technologies            Topic: N/A

    CODES CURRENTLY EXIST THAT WILL CALCULATE THE ELECTROMAGNETIC ENVIRONMENT (EMP) PRODUCED BY A BEAM OF COLLIMATED GAMMA RAYS. THE COLLIMATION MAY BE EITHER CYLINDRICAL OR CONICAL. THE CURRENT EFFORT WILL BE TO INSTALL THE CODES ON AN ARMY CRAY COMPUTER AND TO SET THEM UP AND RUN THEM FOR PROBLEMS OF INTEREST TO THE ARMY.

    SBIR Phase I 1987 Department of DefenseArmy
  6. BIAXIAL INTERFACE STRESS TRANSDUCER FOR HIGH OVERPRESSURES- DEVELOPMENT

    SBC: Applied Research Associates, Inc.            Topic: N/A

    DEFINITION OF THE STRUCTURE-MEDIA INTERACTION (SMI) LOADS ON A BURIED STRUCTURE IS ONE OF THE LARGEST SOURCES OF UNCERTAINTY IN ANALYZING THE SURVIVABILITY OF STRATEGIC STRUCTURES. ADVANCEMENT OF THE STATEOF-THE-ART IN THE MODELING OF SMI BEHAVIOR IS HAMPERED BY A LIMITED DATA BASE WHICH IS CONFINED TO OVERPRESSURES MUCH SMALLER THAN THOSE CURRENTLY OF INTEREST. THIS EFFORT PROPOSES TO DEVELOP AND ...

    SBIR Phase II 1987 Department of DefenseDefense Threat Reduction Agency
  7. DEVELOPMENT OF A HIGH RANGE PARTICLE VELOCITY GAGE

    SBC: Applied Research Associates, Inc.            Topic: N/A

    THERE IS AN ESTABLISHED NEED FOR A SIMPLE ROBUST TRANSDUCER TO MEASURE PARTICLE VELOCITY IN SEVERE BLAST AND SHOCK ENVIRONMENTS SUCH AS NUCLEAR AND HIGH EXPLOSIVE TESTS. A GAGE CONCEPT IS PROPOSED FOR DEVELOPMENT, BASED ON THE PROVEN MEASUREMENT PRINCIPLES USED IN THE HIGHLY SUCCESSFUL DX GAGE, BUT RECONFIGURED MECHANICALLY AND ELECTRICALLY TO WITHSTAND THE HARSH SHOCK ENVIRONMENTS. THE CONCEPT RE ...

    SBIR Phase I 1987 Department of DefenseArmy
  8. GRAVITY EFFECTS ON SMALL-SCALE STRUCTURAL MODELING

    SBC: Applied Research Associates, Inc.            Topic: N/A

    THE PROPOSED EFFORT IS TO DEVELOP MATERIALS AND PROCEDURES TO APPLY REECH-FROUDE SCALING TO SUB-SCALE MODEL TESTS OF REINFORCED CONCRETE STRUCTURES SUBJECTED TO CONVENTIONAL (NON-NUCLEAR) WEAPON EFFECTS.

    SBIR Phase I 1987 Department of DefenseAir Force
  9. IMPACT CHARACTERIZATION FOR IMPROVED PENETRATOR PERFORMANCE AND SURVIVABILITY

    SBC: Applied Research Associates, Inc.            Topic: N/A

    THE CENTRAL POSTULATE OF THE PROPOSED EFFORT IS THAT WEAPONS WILL SENSE THEIR IMPACT CONDITIONS; I.E. TRAJECTORY ANGLE, ANGLE OF ATTACK (AOA), ROTATION VELOCITY, AND VELOCITY IN RELATION TO THE TARGET SURFACE. IF THOSE CONDITIONS ARE LESS THAN BENEFICIAL FOR PENETRATOR SURVIVABILITY AND/OR PERFORMANCE, THE WEAPON WILL ADJUST ITS ORIENTATION TO PRESCRIBED CONDITIONS. WEAPON DESIGNERS HAVE ASSUMED T ...

    SBIR Phase II 1992 Department of DefenseAir Force
  10. FINITE ELEMENT MESH GENERATION FROM A SOLID GEOMETRIC MODEL

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseAir Force
US Flag An Official Website of the United States Government