You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A FIBEROPTIC PROBE TO SIMULTANEOUSLY DETERMINE SOIL WATER CONTENT AND SOIL TEMPERATURE

    SBC: Management Information Resourc            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Agriculture
  2. A PORTABLE, LOW-COST IMAGE PROCESSING PROTOTYPE FOR USE BY INDIVIDUAL SCIENTISTS

    SBC: Microimages Inc.            Topic: N/A

    A PROTOTYPE OF A PORTABLE IMAGE PROCESSING SYSTEM WILL BE CONSTRUCTED USING A LAPTOP MICROCOMPUTER, AN OPTICAL WORM DISK, APPROPRIATE COLOR DISPLAY SUBSYSTEM, AND MODIFICATIONS AND ADDITIONS TO AN EXISTING SOFTWARE PACKAGE WRITTEN IN C AND CURRENTLY RUNNING ON THE DESKTOP IBM PC, XT, AND ATS. THE UNIT WILL ALSO FUNCTION AS A COMPUTER AIDED IMAGE PROCESSING (CAIP) STATION IN A NETWORK OR WITH A MAS ...

    SBIR Phase I 1987 National Aeronautics and Space Administration
  3. MONOLAYER RESOLUTION CHARACTERIZATION BY VARIABLE ANGLE SPECTROSCOPIC ELLIPSOMETRY (VASE)

    SBC: Woollam J A Co            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseDefense Advanced Research Projects Agency
  4. DEVELOPING MATERIALS TO ASSIST NATIVE AMERICAN TRIBES AND ORGANIZAATIONS IN TOURISM DEVELOPMENT

    SBC: Charles Trimble Co            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Health and Human Services
  5. An Integrated ECP for Low Cost EMP Protection of Navy Sites/Stations

    SBC: Electra Magnetic Applications            Topic: N/A

    The development of an innovative low cost RHP hardening approach is proposed for Navy sitee/atations. The Hardening solution ie defined in the form of an ECP, and focuses on reducing costs by having an integrated approach to the design, fabrication, installation, testing, and maintenance of the shield systems. The approach uses prefab parts as much am possible. The coat effectiveness of several co ...

    SBIR Phase I 1992 Department of DefenseNavy
  6. ELECTRON CYCLOTRON RESONANCE (ECR) SEMICONDUCTOR ETCHING PROCESS CONTROL BY ELLIPSOMETRY

    SBC: J. A. Woollam Co., Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseArmy
  7. REAL TIME SPACE MATERIALS DEGRADATION MONITOR USING ELLISPSOMETER

    SBC: J. A. Woollam Co., Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 National Aeronautics and Space Administration
  8. REAL TIME MONITOR AND CONTROL OF MBE GROWTH OF HGCDTE BY SPECTROSCOPIC ELLIOPSOMETRY

    SBC: J. A. Woollam Co., Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseArmy
  9. DISEASE CONTROL IN MILKWEED-SPECIES AND ECOTYPE SELECTION

    SBC: Natural Fibers Corp.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Agriculture
  10. INTERACTIVE VIDEODISC INSTRUCTION OF RESISTANCE SKILLS

    SBC: Sbs Inc.            Topic: N/A

    THIS PROJECT ASSESSES THE POSSIBILITY OF DEVELOPING INTERACTIVE VIDEODISKS TO TEACH ADOLESCENTS REFUSAL SKILLS TO DEAL WITH PRESSURES TO USE ALCOHOL. USING AN ALREADY-PRODUCED EXPERIMENTAL LINEAR VIDEOTAPE, PHASE I ACTIVITIES WILL INCLUDE THE IDENTIFICATION OF SPECIFIC EDUCATIONAL OBJECTIVES, PRODUCTION OF A FLOW CHART OF THE ENTIRE PROGRAM, AND ASSESSMENT OF THE ACCEPTABILITY OF SUCH A PROGRAM TO ...

    SBIR Phase II 1992 Department of Health and Human Services
US Flag An Official Website of the United States Government