You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Next Generation Portable Power Amplifier

    SBC: MAXENTRIC TECHNOLOGIES LLC            Topic: SOCOM131004

    MaXentric proposes the GAU2x2 wideband power amplifier system. The design combines MaXentric’s wideband RF PA technology with advanced digital signal processing in a single small footprint package. This tight integration is made possible through the extremely high efficiency and low power dissipation. Since very little power is dissipated as heat, the package and heat sink size can be minimized. ...

    SBIR Phase II 2019 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government