  1. DEVELOPMENT OF ANGULAR ACCELEROMETER

    SBC: A-TECH CORPORATION            Topic: N/A

    A RESEARCH EFFORT COMPLETED RECENTLY FOR THE AIR FORCE IDENTIFIED NEW TECHNOLOGIES FOR ANGULAR MOTION MEASUREMENT. TWO CONCEPTS WERE FOUND WHICH APPEAR TO OFFER POTENTIAL FOR AN EXCELLENT COMBINATION OF SMALL SIZE, WIDE DYNAMIC RANGE, WIDE BANDWIDTH AND EASE OF FABRICATION AND UTILIZATION. ONE DEVICE, CALLED A FLUID-FILLED BENDER BEAM, USES PIEZOCERAMICELEMENTS TO PRODUCE A SIGNAL PROPORTIONAL TO ...

    SBIR Phase II 1987 Department of Transportation
  2. SIMULATION MODEL OF AIRCRAFT EVACUATION PROCESS

    SBC: Gourary Assoc Inc            Topic: N/A

    THE FEASIBILITY OF BUILDING A PERSONAL COMPUTER MODEL OF THEEVACUATION PROCESS WILL BE STUDIED, USING AN EXPERIMENTAL MODEL DEVELOPED BY GOURARY ASSOCIATES INC. THE RESULTING MODEL WILL PERMIT THE STUDY AND VISUALIZATION OF PASSENGER MOVEMENTS DURING EVACUATION. IT WILL ALSO ALLOW THE STUDY OF THE EFFECTS OF CROWDING, FIRE, OBSTRUCTIONS, AND OTHER EFFECTS DURING THE EVACUATION PROCESS. THE MODEL W ...

    SBIR Phase I 1987 Department of Transportation
  3. CORROSION DETECTION IN AGING AIRCRAFT

    SBC: PHYSICAL ACOUSTICS CORP.            Topic: N/A

    A CONCEPT FOR THE DETECTION OF CORROSION IN AGING AIRCRAFT USING ACOUSTIC EMISSION MONITORING IS PROPOSED. CORROSION WILL BE LOCATED THROUGH THE EFFECT THAT IT HAS ON AIRFRAME STRENGTH (10% THINNING RESULTS IN 50% FATIGUE LIFE REDUCTION). ACOUSTIC EMISSION TECHNOLOGY USED ON THE F-111 FIGHTER/BOMBER WILL BE ADAPTED FOR USE ON COMMERCIAL AIRCRAFT. PRELIMINARY CONCEPT TESTING ON A BOEING 720B HAS RE ...

    SBIR Phase I 1989 Department of Transportation
  4. MEASURING LIVE LOAD STRESSES ON BRIDGES

    SBC: SCIENCE & ENGINEERING ASSOC., INC.            Topic: N/A

    THE DEPARTMENT OF TRANSPORTATION (DOT) IS REQUIRED TO MAIN- TAIN THE NATION'S BRIDGES AND ENSURE THEIR SAFETY. HOWEVER,A LARGE NUMBER OF BRIDGES HAVE NOT BEEN RECENTLY INSPECTED TO DETERMINE IF THEY ARE CAPABLE OF SAFELY SUPPORTING THE TRAFFIC THAT IS CROSSING THEM. THE CURRENT METHOD OF SURVEYING BRIDGES, TO DETERMINE THEIR STRESS CONDITION, IS COSTLY AND TIME-CONSUMING. THIS PROGRAM WILL DEVELOP ...

    SBIR Phase II 1989 Department of Transportation
  5. A NOVEL MASS SPECTROMETER FOR THE DETECTION OF VAPORS FROM EXPLOSIVE, INCENDIARIES AND NOXIOUS GASES

    SBC: Southwest Sciences, Inc.            Topic: N/A

    SOUTHWEST SCIENCIES, INC. PROPOSES A NOVEL MASS SPECTROMETRIC METHOD, * IONIZATION ENERGY MODULATED MASS SPECTROMETRY (IEMMS), FOR THE RAPID DETECTION OF VAPORS FROM EXPLOSIVES, INCENDIARIES AND NOXIOUS GASES. IEMMS COMBINES ELECTRON IMPACT IONIZATION USING A MONOCHROMATIC ELECTRON BEAM WITH ION DETECTION USING TWIN TIME-OF-FLIGHT (TOF) MASS ANALYZERS. ONE ANALYZER QUANTIFIES POSITIVE IONS WHILE T ...

    SBIR Phase I 1992 Department of Transportation
  6. AIRCRAFT SAFTEY

    SBC: SYSTEMS & ELECTRONICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  7. Fast Curing Modular Composite Patch System for Field Applications

    SBC: Continuum Dynamics Inc            Topic: SOCOM07002

    SOCOM requires a method to field repair multiple materials as well as to mount armor and related hardware for a variety of tactical purposes with a composite material. To address this need, we propose application of a “Modular UV Patch” (MUVP) system that incorporates ultraviolet curing resin systems and an innovative technique for delivering the UV light through optically lossy fibers that f ...

    SBIR Phase I 2007 Department of DefenseSpecial Operations Command
  8. Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines

    SBC: Outside Plant Consulting Services, Inc.            Topic: N/A

    The proposed buried innerduct/duct network (BIN) comprises an integrated system to facilitate future upgrades of buried communications (telephony, CATV) and power lines. The objective of the project is to provide improved, cost-effective hardware and practices relative to present buried construction procedures, which do not otherwise allow for future upgrades or replacement of initially installed ...

    SBIR Phase II 2007 Department of Transportation
  9. Next Generation Portable Power Amplifier

    SBC: MAXENTRIC TECHNOLOGIES, LLC            Topic: SOCOM131004

    MaXentric proposes the GAU2x2 wideband power amplifier system. The design combines MaXentric’s wideband RF PA technology with advanced digital signal processing in a single small footprint package. This tight integration is made possible through the extremely high efficiency and low power dissipation. Since very little power is dissipated as heat, the package and heat sink size can be minimized. ...

    SBIR Phase II 2019 Department of DefenseSpecial Operations Command