You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DIGITAL INFRA-RED EYE COMMAND TRANSDUCER

    SBC: Energy Optics, Inc.            Topic: N/A

    ALTHOUGH TECHNOLOGY IS ADVANCING AT AN EVER INCREASING PACE,ITS APPLICATION FOR USE BY HANDICAPPED INDIVIDUALS HAS BEEN SLOW. SEVERELY IMPAIRED INDIVIDUALS OFTEN REQUIRE SOME TYPE OF "HIGH TECHNOLOGY" MEANS TO ENABLE THEM TO HAVE A DEGREE OF MOBILITY. THE SPECIFIC AIM OF THIS PROGRAM IS TO INVESTIGATE THE POTENTIAL OF USING ELECTRO-OPTICS AS A MEANS FOR THE HANDICAPPED TO EFFECT CONTROL OF HIS/HER ...

    SBIR Phase I 1987 Department of Education
  2. RESEARCH AND DEVELOPMENT OF MODELS, GUIDES AND PLANS FOR HANDICAPPED POPULATIONS.

    SBC: Fineblum Educ Serv Inc            Topic: N/A

    THIS PROPOSAL WILL IDENTIFY PRESENT COLLABORATIVE PRACTICES BY SURVEYING HEALTH/EDUCATION COMMITTEES OF THE FIFTY STATES' INTERAGENCY COMMITTEES. POLICY IMPLEMENTATION, TRAINING PROGRAMMING, INFANT AND FAMILY SERVICES, INTRACOMMITTEE MECHANICS, LEAD AGENCY SELECTION, AND OTHER INTERAGENCY FUNCTIONS ARE DETAILED. A DELPHI PROCEDURE WILL BE UTILIZED WITH IDENTIFIED EXEMPLARY COMMITTEES TO ELICIT THE ...

    SBIR Phase I 1987 Department of Education
  3. CURB CLIMBING WHEELCHAIR DEVELOPMENT

    SBC: Triodyne Inc            Topic: N/A

    SIDEWALK RAMPS, ADOPTED FOR THE SAFETY AND CONVENIENCE OF WHEELCHAIR BOUND CITIZENS, HAVE EXHIBITED A NUMBER OF SHORTCOMINGS. MILLIONS OF DOLLARS HAVE BEEN SPENT, AND WILLCONTINUE TO BE SPENT, FOR THE CONVERSION OF CURBS INTO RAMPSA LESS THAN SATISFACTORY SOLUTION TO THE PROBLEM. A MORE FEASIBLE APPROACH TO ALTERING THE MILLIONS OF CURBS IS THE ADDITION OF CURB CLIMBING CAPABILITIES TO THE FIFTY T ...

    SBIR Phase I 1987 Department of Education
  4. INVESTIGATION TO DETERMINE THE VIABILITY OF SPEECH RECOGNITION WITH REAL-TIME CAPTIONING AND TO DEVELOP A COST EFFICIENT MODEL

    SBC: Applications Express Inc            Topic: N/A

    THERE CURRENTLY EXISTS NO ECONOMICALLY PRACTICAL REAL-TIME CAPTIONING DEVICES OR METHODS WHICH CAN PROVIDE A SPEEDY AND ACCURATE REPRODUCTION OF SPEECH-TO-TEXT TRANSLATION IN THE CLASSROOM. THE INTEGRATION OF SPEECH RECOGNITION WITH REAL- TIME CAPTIONING HOLDS THE PROMISE OF PROVIDING A TRANSPARENT INTERFACE BETWEEN THE SPEAKER AND THE AUDIENCE. TN THIS PHASE I RESEARCH, WE WILL CONDUCT AN INVESTI ...

    SBIR Phase I 1992 Department of Education
  5. ELECTRONIC ORIENTATION, MOBILITY AND SAFETY SYSTEM FOR WHEELCHAIR BOUND HANDICAPPED PERSONS

    SBC: Nurion Industries Inc.            Topic: N/A

    THIS PROPOSAL DESCRIBES A DEVELOPMENT PROJECT FOR AN ELECTRONIC ORIENTATION, MOBILITY AND SAFETY SYSTEM FOR WHEELCHAIR BOUND HANDICAPPED PERSONS. THE DEVICE IS PROJECTED TO SERVE TWO MAJOR FUNCTIONS: 1) AS A TEACHING ANDCOMMUNICATIONS TOOL FOR PROFESSIONALS TO TRAIN PERSONS WITH SINGULAR, MULTIPLE, AND/OR SEVERE DISABILITIES; 2) AS A PERMANENT OR TEMPORARY MOBILITY AID USABLE BY PERSONS WITH THESE ...

    SBIR Phase II 1992 Department of Education
  6. Emerging Weapons Technology Evaluation Model

    SBC: APPLIED SCIENCES LABORATORY, INC.            Topic: N/A

    Accelerated development of directed energy technologies has presented new problems to mission planners and weapon operators regarding the capabilities, lethality and performance of weapon systems. The Emerging Weapons Technology Evaluation Model willaddress these shortcomings by providing users of varying technical expertise 1) the ability to model a variety of weapons in various mission scenario ...

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  7. Short-Range Standoff UV Raman Chemical Imaging Detector

    SBC: ChemImage Sensor Systems            Topic: N/A

    ChemImage Corp. and ITT are proposing to demonstrate the feasibility of detecting and identifying chemical and biological threats using UV Raman Chemical Imaging techniques from a stand-off distance of 1 meter and against complex stationary backgroundmaterials such as asphalt and soil as commonly encountered by fielded military and homeland security personnel. The use of a standoff surface detect ...

    SBIR Phase I 2003 Department of DefenseOffice for Chemical and Biological Defense
  8. GOODFEEL Integration

    SBC: Dancing Dots Braille Music Technology LP            Topic: N/A

    N/A

    SBIR Phase I 2003 Department of Education
  9. GOODFEEL Integration

    SBC: Dancing Dots Braille Music Technology LP            Topic: N/A

    N/A

    SBIR Phase II 2003 Department of Education
  10. Special Education Administrative Management System

    SBC: Data Harbor, Inc.            Topic: N/A

    N/A

    SBIR Phase I 2003 Department of Education
US Flag An Official Website of the United States Government