You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. Composite Stuff-Proof Windshield and Lightweight Pilothouse Assembly

    SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME            Topic: N/A

    The Phase II effort builds on Phase I. Phase II starts with an integrated product and process design and engineering analysis of the baseline structure described in the Phase I report and variants that may reduce cost and risk. The emphasis is on use ofnonlinear FEA with continuum analysis to handle stiffeners, window frames, and connectors. After review and approval by SOCOM, the design is fab ...

    SBIR Phase II 2003 Department of DefenseSpecial Operations Command
  2. Advanced Lightweight NBC Protective Clothing

    SBC: UTILITY DEVELOPMENT CORP            Topic: N/A

    N/A

    SBIR Phase II 2003 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government