You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DEVELOPMENT OF ANGULAR ACCELEROMETER

    SBC: A-TECH CORPORATION            Topic: N/A

    A RESEARCH EFFORT COMPLETED RECENTLY FOR THE AIR FORCE IDENTIFIED NEW TECHNOLOGIES FOR ANGULAR MOTION MEASUREMENT. TWO CONCEPTS WERE FOUND WHICH APPEAR TO OFFER POTENTIAL FOR AN EXCELLENT COMBINATION OF SMALL SIZE, WIDE DYNAMIC RANGE, WIDE BANDWIDTH AND EASE OF FABRICATION AND UTILIZATION. ONE DEVICE, CALLED A FLUID-FILLED BENDER BEAM, USES PIEZOCERAMICELEMENTS TO PRODUCE A SIGNAL PROPORTIONAL TO ...

    SBIR Phase II 1987 Department of Transportation
  2. MEASURING LIVE LOAD STRESSES ON BRIDGES

    SBC: SCIENCE & ENGINEERING ASSOC., INC.            Topic: N/A

    THE DEPARTMENT OF TRANSPORTATION (DOT) IS REQUIRED TO MAIN- TAIN THE NATION'S BRIDGES AND ENSURE THEIR SAFETY. HOWEVER,A LARGE NUMBER OF BRIDGES HAVE NOT BEEN RECENTLY INSPECTED TO DETERMINE IF THEY ARE CAPABLE OF SAFELY SUPPORTING THE TRAFFIC THAT IS CROSSING THEM. THE CURRENT METHOD OF SURVEYING BRIDGES, TO DETERMINE THEIR STRESS CONDITION, IS COSTLY AND TIME-CONSUMING. THIS PROGRAM WILL DEVELOP ...

    SBIR Phase II 1989 Department of Transportation
  3. Composite Stuff-Proof Windshield and Lightweight Pilothouse Assembly

    SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME            Topic: N/A

    The Phase II effort builds on Phase I. Phase II starts with an integrated product and process design and engineering analysis of the baseline structure described in the Phase I report and variants that may reduce cost and risk. The emphasis is on use ofnonlinear FEA with continuum analysis to handle stiffeners, window frames, and connectors. After review and approval by SOCOM, the design is fab ...

    SBIR Phase II 2003 Department of DefenseSpecial Operations Command
  4. Advanced Lightweight NBC Protective Clothing

    SBC: UTILITY DEVELOPMENT CORP            Topic: N/A

    N/A

    SBIR Phase II 2003 Department of DefenseSpecial Operations Command
  5. Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines

    SBC: Outside Plant Consulting Services, Inc.            Topic: N/A

    The proposed buried innerduct/duct network (BIN) comprises an integrated system to facilitate future upgrades of buried communications (telephony, CATV) and power lines. The objective of the project is to provide improved, cost-effective hardware and practices relative to present buried construction procedures, which do not otherwise allow for future upgrades or replacement of initially installed ...

    SBIR Phase II 2007 Department of Transportation
  6. Next Generation Portable Power Amplifier

    SBC: MAXENTRIC TECHNOLOGIES LLC            Topic: SOCOM131004

    MaXentric proposes the GAU2x2 wideband power amplifier system. The design combines MaXentric’s wideband RF PA technology with advanced digital signal processing in a single small footprint package. This tight integration is made possible through the extremely high efficiency and low power dissipation. Since very little power is dissipated as heat, the package and heat sink size can be minimized. ...

    SBIR Phase II 2019 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government