You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. LOW DENSITY STRUCTURE FOR AIRBORNE PLATFORMS

    SBC: AEREON CORP.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseAir Force
  2. UNIQUE HIGH TEMPERATURE HIGH PRESSURE GASEOUS PHOTOCHEMICAL REACTOR

    SBC: Aerochem Research            Topic: N/A

    A UNIQUE HIGH TEMPERATURE, HIGH PRESSURE GASEOUS PHOTOCHEMICAL REACTOR WITH OPTICAL AND MASS SPECTROMETRIC SPECIES DETECTION CAPABILITIES WILL BE DESIGNED. THE PROPOSED DESIGN, UTILIZING AEROCHEM'S EXPERIENCE IN CONSTRUCTING AND USING SIMILAR APPARATUS, WILL EXCEED THE UPPER TEMPERATURE AND PRESSURE SPECIFICATIONS GIVEN IN THE SOLICITATION IN ORDER TO GIVE THE INSTRUMENT GREATER UTILITY. ALTERNATE ...

    SBIR Phase I 1987 Department of DefenseArmy
  3. ELECTRONIC EQUIPMENT SHELTERS

    SBC: A.i. Technology Inc            Topic: N/A

    A NEW DESIGN CONCEPT FOR ELECTRONIC SHELTERS USING SOME OF THE ADVANCED MATERIALS SUCH AS CONDUCTIVE COMPOSITES, AND REINFORCED CONDUCTIVE SILICONE FABRICS WILL BE TESTED. THE MOST RELEVENT APPLICATION PARAMETERS SUCH AS CONDUCTIVITY OF THE COMPOSITES AND FABRICS, THE JOINING MECHANISM TO ENSURE ELECTROMAGNETIC COMPATIBILITY, THE FLEXIBILITY, THE TRANSPORTABILITY AND TOTAL SYSTEM WEIGHT WILL BE AD ...

    SBIR Phase I 1987 Department of DefenseAir Force
  4. MATERIALS WITH DUAL RADAR AND THERMAL SUPPRESSION CHARACTERISTICS

    SBC: A.i. Technology Inc            Topic: N/A

    ALTHOUGH THERE ARE NO INTRINSIC CONFLICTS FOR THE SAME MATERIAL SYSTEMS TO ACHIEVE BOTH THE RADAR ABSORPTION AND THERMAL SUPPRESSION CHARACTERISTICS THERE EXISTS NO COMMERCIAL PRODUCT THAT HAS THE DESIRED DUAL PROPERTIES. A THEORETICAL CALCULATION ON THE FEASIBILITY OF SEVERAL PROPOSED MATERIAL SYSTEMS WILL BE PERFORMED. THE CALCULATIONS ARE BASED ON A MEAN FIELD THEORY FOR DIELECTRIC PROPERTIES. ...

    SBIR Phase I 1987 Department of DefenseArmy
  5. POLYIMIDE QUARTZ MULTILAYER BOARD

    SBC: A.i. Technology Inc            Topic: N/A

    A POLYIMIDE BASED POLYMER ALLOY IS PROPOSED TO BE USED AS THE MATRIX FOR A QUARTZ FILLED MULTILAYER CIRCUIT BOARD. POLYIMIDE WHICH HAS THERMAL EXPANSION COEFFICIENT (TEC) OF 30 PPM/DEG C IS SUBSTANTIATLY LOWER THAN THAT OF EPOXY (50-60 PPM/ DEG C). THE POLYMER ALLOY WHICH CONSISTS OF RIGID-RODLIKE MOLECULES, HOWEVER, WILL HAVE TEC AS LOW AS 10-20 PPM/DEG C. QUARTZ FIBER FILLED IN DIFFERENT GEOMETR ...

    SBIR Phase I 1987 Department of DefenseNavy
  6. STANDOFF MINE DETECTOR

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseDefense Advanced Research Projects Agency
  7. MANUFACTURING COST ANALYSIS- GALLIUM ARSENIDE MMIC FOR PHASE ARRAY RADAR TRANSMIT/RECEIVER MODULES

    SBC: Anadigics Inc            Topic: N/A

    MMIC YIELD IS THE SIGNIFICANT FACTOR IN DETERMINING BOTH CHIP COST AND LEVEL OF INTEGRATION. IN ORDER TO MAXIMIZE YIELD, IT IS NECESSARY TO ESTABLISH A CONSISTENT, REPRODUCIBLE PROCESS CONTROL, COUPLED WITH CREATIVE CIRCUIT DESIGN TECHNIQUES USED TO CREATE SHIP SETS WHICH ARE TOLERANT TO PROCESS VARIATIONS. A LARGE PROPORTION OF THE FINAL COST FOR THE END PRODUCT IS RELATED TO THE ASSEMBLY AND FIN ...

    SBIR Phase II 1987 Department of DefenseNavy
  8. ON-WAFER TESTING OF MONOLITHIC MICROWAVE INTEGRATED CIRCUITS (MMICS)

    SBC: Anadigics Inc            Topic: N/A

    WAFER PROBING IS THE CRITICAL LINK BETWEEN WAFER FABRICATION, AND DEVICE PACKAGING OR HYBRID SUBSYSTEM INSERTION. FOR GAAS MMICS TO BE COST EFFECTIVE, THEY MUST BE TESTED IN A MANNER THAT IS RELIABLE, FAST, AND EFFICIENT. THIS PROPOSAL DESCRIBES A PROGRAM TO DEVELOP EQUIPMENT AND TECHNIQUES FOR HIGH RATE, HIGH VOLUME MMIC WAFER PROBING. PHASE I OF THIS PROGRAM WILL INCLUDE AN EXPERIMENT USING EXIS ...

    SBIR Phase I 1987 Department of DefenseAir Force
  9. VARIATIONAL EVALUATION OF EM COUPLING TO A WIRE INSIDE A CAVITY

    SBC: Applied Physics Technologies            Topic: N/A

    CONTRACTOR WILL DEVELOP A LAGRANGIAN FORMULATION FOR THE ELECTROMAGNETIC RESPONSE OF A METALLIC ENCLOSURE WITH THIN, SLIGHTLY DIFFUSIVE WALLS AND A WIRE SPANNING THE ENCLOSURE. CONTRACTOR WILL FIRST DERIVE A LAGRANGIAN OPERATOR ON THE FIELDS WHICH IS STATIONARY WHEN MAXWELL'S EQUATIONS ARE SATISFIED. THE LAGRANGIAN WILL THEN BE USED TO DETERMINE THE ENCLOSURE EIGENMODES (WIRE INCLUDED) AND THE AMP ...

    SBIR Phase I 1987 Department of DefenseArmy
  10. EMP ENVIRONMENT PREDICTION FOR COLLIMATED SOURCES

    SBC: Applied Physics Technologies            Topic: N/A

    CODES CURRENTLY EXIST THAT WILL CALCULATE THE ELECTROMAGNETIC ENVIRONMENT (EMP) PRODUCED BY A BEAM OF COLLIMATED GAMMA RAYS. THE COLLIMATION MAY BE EITHER CYLINDRICAL OR CONICAL. THE CURRENT EFFORT WILL BE TO INSTALL THE CODES ON AN ARMY CRAY COMPUTER AND TO SET THEM UP AND RUN THEM FOR PROBLEMS OF INTEREST TO THE ARMY.

    SBIR Phase I 1987 Department of DefenseArmy
US Flag An Official Website of the United States Government