You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Portable Signal Identification Training

    SBC: Klein & Stump, Inc.            Topic: N/A

    "The portable signal identification training is concise and technologically achievable. The Technical Objectives include the following:1.Generate an intended use document specifying in sufficient detail how the system will be used in training in order to facilitate a high-level hardware system operability design and performance requirements specification.2.Investigate and identify available sma ...

    SBIR Phase I 2002 Department of DefenseSpecial Operations Command
  2. Advanced Lightweight NBC Protective Clothing

    SBC: UTILITY DEVELOPMENT CORP            Topic: N/A

    Our main objective will be to design, fabricate, and evaluate a lightweight semi-permeable or selectively permeable electrospun membrane, allowing ventilation of the wearer without exposure to outside chemical or biological hazards for NBC protectivesuits. These light weight semi permeable membranes will have the capability to provide time until agent break through after receiving an age ...

    SBIR Phase I 2002 Department of DefenseSpecial Operations Command
  3. Emerging Weapons Technology Evaluation Model

    SBC: APPLIED SCIENCES LABORATORY, INC.            Topic: N/A

    Accelerated development of directed energy technologies has presented new problems to mission planners and weapon operators regarding the capabilities, lethality and performance of weapon systems. The Emerging Weapons Technology Evaluation Model willaddress these shortcomings by providing users of varying technical expertise 1) the ability to model a variety of weapons in various mission scenario ...

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  4. SOF Micro Lab

    SBC: F&H APPLIED SCIENCE ASSOC., INC.            Topic: N/A

    The overall goal of this program is to build a compact, lightweight, portable laboratory kit that can be used to analyze chemistries, cell counts, parasites, bacteria, and other pathogens in blood, urine, and body fluids. Our proposed Portable Micro-Lab(PML) kit will be composed of two sub-systems:1) Environmentally stable microdot test strips smaller than a stick of chewing gum and containing th ...

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  5. Composite Stuff-Proof Windshield and Lightweight Pilothouse Assembly

    SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME            Topic: N/A

    The Phase II effort builds on Phase I. Phase II starts with an integrated product and process design and engineering analysis of the baseline structure described in the Phase I report and variants that may reduce cost and risk. The emphasis is on use ofnonlinear FEA with continuum analysis to handle stiffeners, window frames, and connectors. After review and approval by SOCOM, the design is fab ...

    SBIR Phase II 2003 Department of DefenseSpecial Operations Command
  6. Battery Modulation for Communications Equipment

    SBC: Policell Technolpgies, Inc.            Topic: N/A

    Policell Technologies Inc. proposes 6 month research effort to demonstrate the feasibility of replacing the lithium BA-5590 with a rechargeable battery. It is proposed to design and develop basic pouch lithium-ion cells that are suitable for assembly ofBA-5590 battery and deliver some basic pouch cells to SOCOM by the end of the Phase I program. The battery system will be based on Policell Technol ...

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  7. Advanced Lightweight NBC Protective Clothing

    SBC: UTILITY DEVELOPMENT CORP            Topic: N/A

    N/A

    SBIR Phase II 2003 Department of DefenseSpecial Operations Command
  8. Advanced Opaque Armor Materials and Manufacturing Methods

    SBC: UTILITY DEVELOPMENT CORP            Topic: SOCOM14003

    ""The objective will be to develop and evaluate a low cost, light weight armor package that will have reduced visual signature while offering high protection against threats for Non Standard Commercial Vehicles (NSCV). UDC will conduct design studies to determine the maximum thickness, weight and geometry, visual signature of the armor package. The ballistic testing will be performed with 50 calib ...

    SBIR Phase I 2014 Department of DefenseSpecial Operations Command
  9. Next Generation Portable Power Amplifier

    SBC: MAXENTRIC TECHNOLOGIES LLC            Topic: SOCOM131004

    MaXentric proposes the GAU2x2 wideband power amplifier system. The design combines MaXentric’s wideband RF PA technology with advanced digital signal processing in a single small footprint package. This tight integration is made possible through the extremely high efficiency and low power dissipation. Since very little power is dissipated as heat, the package and heat sink size can be minimized. ...

    SBIR Phase II 2019 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government