You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Emerging Weapons Technology Evaluation Model

    SBC: APPLIED SCIENCES LABORATORY, INC.            Topic: N/A

    Accelerated development of directed energy technologies has presented new problems to mission planners and weapon operators regarding the capabilities, lethality and performance of weapon systems. The Emerging Weapons Technology Evaluation Model willaddress these shortcomings by providing users of varying technical expertise 1) the ability to model a variety of weapons in various mission scenario ...

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  2. SOF Micro Lab

    SBC: F&H APPLIED SCIENCE ASSOC., INC.            Topic: N/A

    The overall goal of this program is to build a compact, lightweight, portable laboratory kit that can be used to analyze chemistries, cell counts, parasites, bacteria, and other pathogens in blood, urine, and body fluids. Our proposed Portable Micro-Lab(PML) kit will be composed of two sub-systems:1) Environmentally stable microdot test strips smaller than a stick of chewing gum and containing th ...

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  3. Battery Modulation for Communications Equipment

    SBC: Policell Technolpgies, Inc.            Topic: N/A

    Policell Technologies Inc. proposes 6 month research effort to demonstrate the feasibility of replacing the lithium BA-5590 with a rechargeable battery. It is proposed to design and develop basic pouch lithium-ion cells that are suitable for assembly ofBA-5590 battery and deliver some basic pouch cells to SOCOM by the end of the Phase I program. The battery system will be based on Policell Technol ...

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  4. SWIR Imaging for Accurate Targeting of 40 mm Grenades and Small Rockets

    SBC: PRINCETON INFRARED TECHNOLOGIES INC            Topic: SOCOM182001

    A small size, weight, and power visible/Short Wave Infrared (SWIR) camera system will be developed to be inserted in a 40mm grenade to enable visual guidance.This 320x256 on 8 m pitch InGaAs imaging system will be able to image light from 0.4 to 1.7 m enabling the precision engagement of targets during the day and night as well as in fog and through smoke using the advantages of SWIR imaging.The i ...

    SBIR Phase I 2018 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government