You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DIGITAL INFRA-RED EYE COMMAND TRANSDUCER

    SBC: Energy Optics, Inc.            Topic: N/A

    ALTHOUGH TECHNOLOGY IS ADVANCING AT AN EVER INCREASING PACE,ITS APPLICATION FOR USE BY HANDICAPPED INDIVIDUALS HAS BEEN SLOW. SEVERELY IMPAIRED INDIVIDUALS OFTEN REQUIRE SOME TYPE OF "HIGH TECHNOLOGY" MEANS TO ENABLE THEM TO HAVE A DEGREE OF MOBILITY. THE SPECIFIC AIM OF THIS PROGRAM IS TO INVESTIGATE THE POTENTIAL OF USING ELECTRO-OPTICS AS A MEANS FOR THE HANDICAPPED TO EFFECT CONTROL OF HIS/HER ...

    SBIR Phase I 1987 Department of Education
  2. RESEARCH AND DEVELOPMENT OF MODELS, GUIDES AND PLANS FOR HANDICAPPED POPULATIONS.

    SBC: Fineblum Educ Serv Inc            Topic: N/A

    THIS PROPOSAL WILL IDENTIFY PRESENT COLLABORATIVE PRACTICES BY SURVEYING HEALTH/EDUCATION COMMITTEES OF THE FIFTY STATES' INTERAGENCY COMMITTEES. POLICY IMPLEMENTATION, TRAINING PROGRAMMING, INFANT AND FAMILY SERVICES, INTRACOMMITTEE MECHANICS, LEAD AGENCY SELECTION, AND OTHER INTERAGENCY FUNCTIONS ARE DETAILED. A DELPHI PROCEDURE WILL BE UTILIZED WITH IDENTIFIED EXEMPLARY COMMITTEES TO ELICIT THE ...

    SBIR Phase I 1987 Department of Education
  3. CURB CLIMBING WHEELCHAIR DEVELOPMENT

    SBC: Triodyne Inc            Topic: N/A

    SIDEWALK RAMPS, ADOPTED FOR THE SAFETY AND CONVENIENCE OF WHEELCHAIR BOUND CITIZENS, HAVE EXHIBITED A NUMBER OF SHORTCOMINGS. MILLIONS OF DOLLARS HAVE BEEN SPENT, AND WILLCONTINUE TO BE SPENT, FOR THE CONVERSION OF CURBS INTO RAMPSA LESS THAN SATISFACTORY SOLUTION TO THE PROBLEM. A MORE FEASIBLE APPROACH TO ALTERING THE MILLIONS OF CURBS IS THE ADDITION OF CURB CLIMBING CAPABILITIES TO THE FIFTY T ...

    SBIR Phase I 1987 Department of Education
  4. INVESTIGATION TO DETERMINE THE VIABILITY OF SPEECH RECOGNITION WITH REAL-TIME CAPTIONING AND TO DEVELOP A COST EFFICIENT MODEL

    SBC: Applications Express Inc            Topic: N/A

    THERE CURRENTLY EXISTS NO ECONOMICALLY PRACTICAL REAL-TIME CAPTIONING DEVICES OR METHODS WHICH CAN PROVIDE A SPEEDY AND ACCURATE REPRODUCTION OF SPEECH-TO-TEXT TRANSLATION IN THE CLASSROOM. THE INTEGRATION OF SPEECH RECOGNITION WITH REAL- TIME CAPTIONING HOLDS THE PROMISE OF PROVIDING A TRANSPARENT INTERFACE BETWEEN THE SPEAKER AND THE AUDIENCE. TN THIS PHASE I RESEARCH, WE WILL CONDUCT AN INVESTI ...

    SBIR Phase I 1992 Department of Education
  5. Emerging Weapons Technology Evaluation Model

    SBC: APPLIED SCIENCES LABORATORY, INC.            Topic: N/A

    Accelerated development of directed energy technologies has presented new problems to mission planners and weapon operators regarding the capabilities, lethality and performance of weapon systems. The Emerging Weapons Technology Evaluation Model willaddress these shortcomings by providing users of varying technical expertise 1) the ability to model a variety of weapons in various mission scenario ...

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  6. Special Education Administrative Management System

    SBC: Data Harbor, Inc.            Topic: N/A

    N/A

    SBIR Phase I 2003 Department of Education
  7. SOF Micro Lab

    SBC: F&H APPLIED SCIENCE ASSOC., INC.            Topic: N/A

    The overall goal of this program is to build a compact, lightweight, portable laboratory kit that can be used to analyze chemistries, cell counts, parasites, bacteria, and other pathogens in blood, urine, and body fluids. Our proposed Portable Micro-Lab(PML) kit will be composed of two sub-systems:1) Environmentally stable microdot test strips smaller than a stick of chewing gum and containing th ...

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  8. Low Cost, Efficacious Disaster Training System and Courses for Elementary/Secondary School Personnel

    SBC: HyperGalaxy, Inc.            Topic: N/A

    N/A

    SBIR Phase I 2003 Department of Education
  9. Low Cost, Efficacious Disaster Training System and Courses for Elementary/Secondary School Personnel

    SBC: HyperGalaxy, Inc.            Topic: N/A

    N/A

    SBIR Phase II 2003 Department of Education
  10. Composite Stuff-Proof Windshield and Lightweight Pilothouse Assembly

    SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME            Topic: N/A

    The Phase II effort builds on Phase I. Phase II starts with an integrated product and process design and engineering analysis of the baseline structure described in the Phase I report and variants that may reduce cost and risk. The emphasis is on use ofnonlinear FEA with continuum analysis to handle stiffeners, window frames, and connectors. After review and approval by SOCOM, the design is fab ...

    SBIR Phase II 2003 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government