You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Emerging Weapons Technology Evaluation Model

    SBC: APPLIED SCIENCES LABORATORY, INC.            Topic: N/A

    Accelerated development of directed energy technologies has presented new problems to mission planners and weapon operators regarding the capabilities, lethality and performance of weapon systems. The Emerging Weapons Technology Evaluation Model willaddress these shortcomings by providing users of varying technical expertise 1) the ability to model a variety of weapons in various mission scenario ...

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  2. Direction Finding (DF) Module

    SBC: APPLIED SIGNAL & IMAGE TECHNOLOGY, INC.            Topic: N/A

    The SOCOM direction finding (DF) requirement is a small, low-power package that is modular in design and capable of interoperating with a variety of receivers including the SIGINT Threat Warning receivers currently under development by Digital ReceiverTechnology, Inc. and Applied Signal Technology, Inc. Applied Signal and Image Technology is uniquely positioned to offer SOCOM a solution for this ...

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  3. Portable Wireless Monitoring Station

    SBC: DIGITAL RECEIVER TECHNOLOGY, INC.            Topic: N/A

    Under phase I of this program, DRT identified a feasible design approach that very nearly meets or exceeds the requirements for this portable wireless receiving system. The critical areas of size, weight, power consumption, performance and ruggedness wereall addressed. Along with major breakthroughs in power and size reduction, the mechanical design was refined to implement an innovative, passiv ...

    SBIR Phase II 2003 Department of DefenseSpecial Operations Command
  4. Portable Wireless Monitoring Station

    SBC: DIGITAL RECEIVER TECHNOLOGY, INC.            Topic: N/A

    Under phase I of this program, DRT identified a feasible design approach that very nearly meets or exceeds the requirements for this portable wireless receiving system. The critical areas of size, weight, power consumption, performance and ruggedness wereall addressed. Along with major breakthroughs in power and size reduction, the mechanical design was refined to implement an innovative, passiv ...

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  5. SOF Micro Lab

    SBC: F&H APPLIED SCIENCE ASSOC., INC.            Topic: N/A

    The overall goal of this program is to build a compact, lightweight, portable laboratory kit that can be used to analyze chemistries, cell counts, parasites, bacteria, and other pathogens in blood, urine, and body fluids. Our proposed Portable Micro-Lab(PML) kit will be composed of two sub-systems:1) Environmentally stable microdot test strips smaller than a stick of chewing gum and containing th ...

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  6. Advanced Ureteroscopy Simulation Workstation for Medical

    SBC: IMMERSION MEDICAL, INC.            Topic: N/A

    This Phase II proposal describes the development of a comprehensive, field-ready, computer-based simulation for training in therapeutic ureteroscopy. Built on a foundation for simulating diagnostic ureteroscopy, the Phase II design combines elements fromtwo recently advanced simulation platforms for training in operative hysteroscopy and endovascular procedures. Primary hardware challenges include ...

    SBIR Phase II 2003 Department of DefenseOffice of the Secretary of Defense
  7. Threat Warning Software

    SBC: Next Century Corporation            Topic: N/A

    The goal of this SBIR effort has been to extend the relevance of SIGINT information to operators without extensive training in that domain. The Phase I contract produced a working demonstration of an innovative Threat Warning System prototype thatprocessed SIGINT information acquired via a bodyworn antenna vest and provided the operator with a visual display of the immediate threat environment vi ...

    SBIR Phase II 2003 Department of DefenseSpecial Operations Command
  8. Battery Modulation for Communications Equipment

    SBC: Policell Technolpgies, Inc.            Topic: N/A

    Policell Technologies Inc. proposes 6 month research effort to demonstrate the feasibility of replacing the lithium BA-5590 with a rechargeable battery. It is proposed to design and develop basic pouch lithium-ion cells that are suitable for assembly ofBA-5590 battery and deliver some basic pouch cells to SOCOM by the end of the Phase I program. The battery system will be based on Policell Technol ...

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  9. Computer-based Simulation Technology for Training Technical

    SBC: SIMQUEST INTERNATIONAL, LLC            Topic: N/A

    This project will develop a `Simulation Training and Evaluation Platform (STEP)' that will provide combat medics, emergency medical technicians (EMTs), nurses and physicians with an integrated simulation environment for initial and refresher training inlife-saving procedures. A primary objective of the research will be the development of a scaleable Learning Management System that can support a ra ...

    SBIR Phase II 2003 Department of DefenseOffice of the Secretary of Defense
  10. Scalable 500W Fieldable TPV Power Supply

    SBC: STRUCTURED MATERIALS INDUSTRIES, INC.            Topic: N/A

    We propose to develop a 500W thermophotovoltaic based power supply by combining and optimizing our highest efficiency 2.4 micron cutoff thermophotovoltaic cells with our partners developed burner that uses conventional fuels. In Phase I, we will completeengineering design based upon existing and projected capabilities. In Phase II we will build, field and test a manufacturable prototype. In Phase ...

    SBIR Phase I 2003 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government