Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until September, 2020.

  1. DEEP WATER CTD HANDLING SYSTEM

    SBC: Product Planning, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Commerce
  2. SIMULATION MODEL OF AIRCRAFT EVACUATION PROCESS

    SBC: Gourary Assoc Inc            Topic: N/A

    THE FEASIBILITY OF BUILDING A PERSONAL COMPUTER MODEL OF THEEVACUATION PROCESS WILL BE STUDIED, USING AN EXPERIMENTAL MODEL DEVELOPED BY GOURARY ASSOCIATES INC. THE RESULTING MODEL WILL PERMIT THE STUDY AND VISUALIZATION OF PASSENGER MOVEMENTS DURING EVACUATION. IT WILL ALSO ALLOW THE STUDY OF THE EFFECTS OF CROWDING, FIRE, OBSTRUCTIONS, AND OTHER EFFECTS DURING THE EVACUATION PROCESS. THE MODEL W ...

    SBIR Phase I 1987 Department of Transportation
  3. RESEARCH AND DEVELOPMENT OF MODELS, GUIDES AND PLANS FOR HANDICAPPED POPULATIONS.

    SBC: Fineblum Educ Serv Inc            Topic: N/A

    THIS PROPOSAL WILL IDENTIFY PRESENT COLLABORATIVE PRACTICES BY SURVEYING HEALTH/EDUCATION COMMITTEES OF THE FIFTY STATES' INTERAGENCY COMMITTEES. POLICY IMPLEMENTATION, TRAINING PROGRAMMING, INFANT AND FAMILY SERVICES, INTRACOMMITTEE MECHANICS, LEAD AGENCY SELECTION, AND OTHER INTERAGENCY FUNCTIONS ARE DETAILED. A DELPHI PROCEDURE WILL BE UTILIZED WITH IDENTIFIED EXEMPLARY COMMITTEES TO ELICIT THE ...

    SBIR Phase I 1987 Department of Education
  4. CURB CLIMBING WHEELCHAIR DEVELOPMENT

    SBC: Triodyne Inc            Topic: N/A

    SIDEWALK RAMPS, ADOPTED FOR THE SAFETY AND CONVENIENCE OF WHEELCHAIR BOUND CITIZENS, HAVE EXHIBITED A NUMBER OF SHORTCOMINGS. MILLIONS OF DOLLARS HAVE BEEN SPENT, AND WILLCONTINUE TO BE SPENT, FOR THE CONVERSION OF CURBS INTO RAMPSA LESS THAN SATISFACTORY SOLUTION TO THE PROBLEM. A MORE FEASIBLE APPROACH TO ALTERING THE MILLIONS OF CURBS IS THE ADDITION OF CURB CLIMBING CAPABILITIES TO THE FIFTY T ...

    SBIR Phase I 1987 Department of Education
  5. DESIGN OF A PROTON MEDICAL ACCELERATOR

    SBC: Acctek Associates, Inc.            Topic: N/A

    THE LONG-RANGE GOAL OF THIS PROGRAM IS THE DEVELOPMENT AND COMMERCIALIZATION OF PROTON ACCELERATORS SUITABLE FOR RADIATION THERAPY OF CANCER IN HOSPITAL OR CLINICAL SETTINGS. FOR THIS PURPOSE THE ACCELERATOR SHOULD HAVE AN ENERGY UP TO 250 MEV, AND MUST BE SIMPLE, RELIABLE, AND INEXPENSIVE COMPARED TO EXISTING ACCELERATORS FOR PHYSICS APPLICATIONS. IN ADDITION, WITH SUFFICIENT INNOVATION, IT COULD ...

    SBIR Phase II 1987 Department of Health and Human Services
  6. A SELF-REGULATING PUMP CHAMBER FOR STANDARD ROLLER PUMPS

    SBC: Adam Spence Corpon            Topic: N/A

    THE ROLLER PUMP, USED TO PUMP BLOOD FLOW DURING CARDIOPULMONARY BYPASS AND TO PROVIDE LONG-TERM CIRCULATORY SUPPORT, IS A CONSTANT-BLOOD-FLOW DEVICE. IT MAINTAINS CONSTANT FLOW INDEPENTLY OF THE CLINICALLY EXPECTED CHANGES IN INLET PRESSURES. A DECREASE IN BLOOD SUPPLY TO THE INLET OF THE PUMP WITHOUT A CONCOMITANT DECREASE IN PUMP SPEED CAN CAUSE EXCESSIVE SUCTION LEADING TO AIR EMBOLISM, THROMBO ...

    SBIR Phase I 1987 Department of Health and Human Services
  7. QUANTITATION OF ESTROGEN CONCENTRATION IN CELLS

    SBC: Cell Analysis Systems Inc.            Topic: N/A

    THE OBJECTIVE OF THIS PROJECT IS TO DEVELOP QUANTITATIVE ESTROGEN RECEPTOR CONCENTRATION MEASUREMENTS USING HIGH- RESOLUTION DIGITAL IMAGE MICROSCOPY TECHNIQUES. THE TECHNIQUES WILL ENABLE DIRECT MEASUREMENTS OF RECEPTOR CONCENTRATION ON A CELL-BY-CELL BASIS. THIS IS AN IMPROVEMENT OVER THE CURRENT BIOCHEMICAL ASSAYS, WHICH GIVE ONLY AN AVERAGE VALUE FOR RECEPTOR CONCENTRATION. THE QUANTITATIVE AS ...

    SBIR Phase II 1987 Department of Health and Human Services
  8. A RESORBABLE COLLAGEN PROSTHESES FOR REPAIR

    SBC: Colla-tec, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Health and Human Services
  9. UPDATING THE TRYON MULTIVARIATE ANALYSIS COMPUTER SYSTEM

    SBC: D2 Associates            Topic: N/A

    THE PRIME LONG-TERM OBJECTIVE OF THIS PROJECT IS TO UPDATE, ENHANCE, AND DISTRIBUTE TWO COMPUTER PROGRAMS UTILIZING THE UNIQUE MULTIVARIATE ANALYSIS TECHNIQUES DEVELOPED BY THE PSYCHOLOGIST ROBERT TRYON WITH NIH SUPPORT DURING THE 1960S. ONE LONG-TERM GOAL IS TO PRODUCE AN ENHANCED ALL-FORTRAN VERSION OF A MAIN BCTRY82 SYSTEM, PORTABLE TO MOST LARGE COMPUTERS. A SECOND LONG-TERM GOAL IS TO PRODUCE ...

    SBIR Phase II 1987 Department of Health and Human Services
  10. ULTRASOUND DOPPLER/B-MODE BREAST SCANNER

    SBC: Daltex Medical Sciences Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Health and Human Services
US Flag An Official Website of the United States Government