You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. HLA Development Tools

    SBC: ACUSOFT, INC.            Topic: N/A

    AcuSoft proposes to develop a set of HLA Development Tools to assist simulation software developers in their efforts to implement the HLA. The HLA Development Tools will support the Federation Execution and Development Process (FEDEP) and present an approach to solving the problems associated with the HLA's flexible FOM data definitions. A set of data visualization tools, such as a 2D Plan View ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  2. Research and Development of a Synthetic Environment RTI

    SBC: ACUSOFT, INC.            Topic: N/A

    AcuSoft proposes to research and develop a Synthetic Environment RTI (SE-RTI). The SEDRIS initiative has established a new programming paradigm that provides lossless transmission of synthetic environment objects. The HLA has been designed to support interoperability and reuse of DoD simulations, and SEDRIS is a major component of HLA. Currently, the SEDRIS data model, APIs and format are prima ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  3. Database Conversion Software

    SBC: ACUSOFT, INC.            Topic: N/A

    AcuSoft proposes to research and develop a database conversion tool based on the Synthetic Environment Data Representation and Interchange Specification (SEDRIS) to maximize the reusability and interchangeability of existing and future USSOCOM database. In the proposed PHASE I effort, we will investigate SEDRIS technology and develop a functioning prototype tools to demonstrate the ability to imp ...

    SBIR Phase I 1998 Department of DefenseOffice of the Secretary of Defense
  4. FEROELECTRIC SCANNED ARRAY (FESA)

    SBC: ATLANTIC AEROSPACE ELECTRONICS CORP.            Topic: N/A

    A novel beamforming network is proposed to electronically scan two independent beams in a conformal phase array. The beamformer utilizes ferroelectric materials in the RF distribution network to control the amplitudes and phases of the array element excitations. One beamformer board is required for each beam and four low power DC voltages per beamformer are needed to achieve total hemispherical ...

    SBIR Phase I 1998 Department of DefenseOffice of the Secretary of Defense
  5. Fiber-Optic Instrumented Garments

    SBC: BIG LIGHT TECHNOLOGY, INC.            Topic: N/A

    Big Light Technology, Inc. proposes to develop a light weight, comfortable, flexible, form fitting instrumented garment. The instrumented garment will be capable of monitoring the skin temperature at multiple localized torso locations using fiber-optic sensors incorporated on a single optical fiber. The sensors are passive and will therefore require no external power. The method for monitoring ...

    SBIR Phase I 1998 Department of DefenseOffice of the Secretary of Defense
  6. ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.

    SBC: Corpe Corp.            Topic: N/A

    AT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  7. SEISMIC MONITORING SYSTEM FOR LOCAL AND REGIONAL NETWORK

    SBC: ENSCO Inc            Topic: N/A

    THE DEVELOPMENT OF A COMPUTERIZED SYSTEM FOR MONITORING LOCAL AND REGIONAL SEISMIC EVENTS IS PROPOSED. THIS AUTOMATED SYSTEM WILL INCORPORATE MANY OF THE ADVANCED SEISMIC ANALYSIS TECHNIQUES THAT CAN ONLY BE FOUND IN SPECIALIZED AND LARGE SYSTEMS FOR MONITORING UNDERGROUND NUCLEAR EXPLOSIONS THROUGHOUT THE WORLD. AMONG THE STATE-OF-THE-ART METHODOLOGIES WE WILL INTEGRATE INTO THE SYSTEM ARE THE NE ...

    SBIR Phase I 1993 Nuclear Regulatory Commission
  8. ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM

    SBC: EPOCH ENGINEERING, INC.            Topic: N/A

    WHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  9. Polymer Electrolyte through Enzyme Catalysis for High Performance Lithium-Ion Batteries

    SBC: Fractal Systems, Inc.            Topic: N/A

    This SBIR Phase I project has for a goal the development of a solid-state polymer electrolyte for use in lithium-ion batteries via enzyme-catalyzed polymerization of monomers substituted with long ether segments. The high content of ether segments such as poly (ethylene oxide) or poly(ethylene glycol) is expected to yield high ionic conductivities when combined with the proper lithium salt. The ...

    SBIR Phase I 1998 Department of DefenseOffice of the Secretary of Defense
  10. DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA

    SBC: Frh, Inc.            Topic: N/A

    CHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government