You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A FIBER OPTIC ARRAY DETECTOR

    SBC: Amparo Corp.on            Topic: N/A

    WIRE CHAMBERS ARE A CLASS OF PARTICLE TRACK DETECTORS THAT HAVE FOUND WIDE APPLICATIONS IN HIGH ENERGY PARTICLE PHYSICS EXPERIMENTS. LARGE WIRE CHAMBER DETECTORS HAVE BECOME RATHER COMPLEX, REQUIRING MANY FAST ELECTRONIC CIRCUITS. THIS INVESTIGATION OFFERS THE POTENTIAL OF SIMPLIFICATION AND COST REDUCTION FOR LARGE WIRE CHAMBER DETECTORS. THE PHASE I EFFORT IS INVESTIGATING THE FEASIBILITY OF USI ...

    SBIR Phase I 1992 Department of Energy
  2. A HIGH POWER THICK TARGET DESIGN FOR IRRADIATION BY HIGH INTENSITY CHARGED PARTICLE BEAMS

    SBC: Amparo Corp.on            Topic: N/A

    PHASE I ADDRESSES A NEW APPROACH FOR THE DESIGN OF HIGH POWER NUCLEAR TARGETS USED FOR PRODUCTION OF RADIOISOTOPES BY HIGH ENERGY CHARGED PARTICLE BEAMS, NOTABLY HIGH ENERGY PROTONS. SUCH TARGETS WILL YIELD LARGER QUANTITIES OF RADIOACTIVE SPECIES THAN PRESENTLY AVAILABLE, EITHER FOR BASIC RESEARCH (E.G., STUDIES USING RADIOACTIVE BEAMS) OR FOR APPLIED PURPOSES (E.G., PRODUCTION OF MEDICAL RADIOI ...

    SBIR Phase I 1994 Department of Energy
  3. A HIGH POWER SOLID-STATE AMPLIFIER

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  4. THE PERIPHERAL COMPONENT INTERCONNECTION/SCALABLE COHERENT INTERFACE BRIDGE FOR DATA ACQUISITION AND COMPUTATION APPLICATIONS

    SBC: BI RA SYSTEMS, INC            Topic: N/A

    COALESCING THE FRAGMENTED INFORMATION ASSOCIATED WITH EACH EVENT OF A HIGH-ENERGY PHYSICS DETECTOR AND THEN PROCESSING IT AT THE RATES DEMANDED BY ACCELERATOR SYSTEMS ARE AMONG THE LARGEST CHALLENGES IN THE PHYSICS COMMUNITY. NEW DETECTOR SYSTEMS CONTINUE TO INCREASE THE NUMBER OF MEASURED PARAMETERS AND SIMULTANEOUSLY INCREASE THE RESOLUTION OF DETECTOR COMPONENTS SO THAT THE VOLUME OF GENRATED ...

    SBIR Phase I 1994 Department of Energy
  5. A RUGGED ON-LINE MULTIPLE INPUT FIBER OPTIC-BASED RAMAN SENSOR FOR INDUSTRIAL PROCESS MONITORING AND CONTROL

    SBC: Chromex Inc.            Topic: N/A

    RESEARCH IN THIS PROJECT IS BEING CONDUCTED TO DEVELOP A COMPACT, RUGGED, ON-LINE, MULTIPLE INPUT, FIBER OPTIC-BASED RAMAN PROCESS MONITORING AND CONTROL SENSOR CAPABLE OF OPERATING IN HARSH INDUSTRIAL ENVIRONMENTS. CHARGE-COUPLED DEVICE ARRAY DETECTOR-BASED RAMAN SPECTROSCOPY, EMPLOYING LASER DIODES AND OPTICAL FIBER PROBES, CAPABLE OF SENSITIVITIES COMPARABLE TO OR BETTER THAN THE FOURIER TRANSF ...

    SBIR Phase I 1992 Department of Energy
  6. FEASIBILITY OF AN ULTRA-CENTRIFUGE FOR DRYING COMMINUTED DEEP CLEANED COAL

    SBC: Coal Tech Corp.            Topic: N/A

    THE DEEP CLEANING PROCESSES NOW UNDER INVESTIGATION FOR COAL MOST OFTEN INVOLVE PULVERIZING AND THE USE OF A LIQUID PROCESS MEDIUM. IF THE VERY FINE DEEP CLEANED COAL IS TO BE USED IN A DRY FORM, A SATISFACTORY DRYING TECHNOLOGY IS VITAL. PREVIOUS STUDIES HAVE INDICATED A SUBSTANTIAL PROBABILITY OF SUCCESS IF THE ULTRAHIGH LEVELS OF CENTRIFUGE GRAVITY ARE COMBINED WITH THE CENTRIFUGAL DECANTING/FI ...

    SBIR Phase I 1992 Department of Energy
  7. A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles

    SBC: Commercial Electronics, Inc.            Topic: N/A

    86 A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles--Commercial Electronics, Inc., 801 North 15th Street, Broken Arrow, OK 74012-2838; (918) 251-0925 Mr. Scott Phillips, Principal Investigator Mr. Michael A. Phillips, Business Official DOE Grant No. DE-FG03-97ER82353 Amount: $75,000 Among the various alternative fuels propos ...

    SBIR Phase I 1997 Department of Energy
  8. A SYNTHETIC BEAM SONAR SYSTEM FOR MOBILE ROBOTS AND TELEOPERATORS

    SBC: Cybermation Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  9. LNG Storage and Delivery System Analysis

    SBC: Directed Technologies, Inc.            Topic: N/A

    87 LNG Storage and Delivery System Analysis--Directed Technologies, Inc., 4001 North Fairfax Drive, Suite 775, Arlington, VA 22203-1614; (703) 243-3383 Mr. Brian D. James, Principal Investigator Mr. Ira F. Kuhn, Jr., Business Official DOE Grant No. DE-FG02-97ER82357 Amount: $75,000 To reduce foreign fuel dependence and improve the Nation¿s air quality, new high-efficiency, direct-injection d ...

    SBIR Phase I 1997 Department of Energy
  10. HUMAN PRESENCE DETECTION IN VEHICLES

    SBC: ENSCO Inc            Topic: N/A

    AN EXISTING SYSTEM HAS DEMONSTRATED, IN QUIET CONDITIONS, VERY RELIABLE DETECTION OF HUMANS HIDDEN IN VEHICLES. SEISMIC VIBRATIONS ARE THE MAJOR, UNAVOIDABLE LIMITATIONS. MEASUREMENT OF THE SEISMIC VIBRATIONS AND COHERENT ANALYSES WILL BE UTILIZED TO COMPUTE AND SUBTRACT THE EFFECT OF THE SEISMIC INTERFERENCE ON THE VEHICLE MOTION. THE PHASE I EFFORT WILL IMPROVE THE RELIABILITY, INCREASE THE S ...

    SBIR Phase I 1994 Department of Energy
US Flag An Official Website of the United States Government