You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  2. ASSESSING AND INCREASING THE TESTABILITY OF OBJECT-ORIENTED SOFTWARE

    SBC: Cigital, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Commerce
  3. NO MOVING PARTS RAIN GAUGE

    SBC: THE CORE GROUP, INC.            Topic: N/A

    THE U.S. WEATHER SERVICE PRESENTLY USES A "TIPPING BUCKET" RAIN GAUGE FOR MEASURING RAIN ACCUMULATION. THIS DEVICE IS SENSITIVE TO WIND AND MOTION (AS ON BUOYS), CANNOT MEASURE RAIN RATE, AND REQUIRES FREQUENT MAINTENANCE, BECAUSE OF MOVING PARTS. AN ALTERNATIVE DEVICE IS BEING PROPOSED, WHICH INCORPORATES A RIGID, RESONANT TUBE, CLOSED AT THE TOP BY AN ELECTRO-ACOUSTIC TRANSDUCER, AND AT THE BOTT ...

    SBIR Phase I 1994 Department of Commerce
  4. ROBUST DESIGN ENGINEERING WORKSTATION

    SBC: MANAGEMENT SCIENCES INC            Topic: N/A

    MSI PROPOSES TO INCORPORATE BACKGROUND SUBSTITUTION OF "FAULTY MODELS" IN CAD DESIGN SIMULATION OF ELECTRONIC CIRCUITS TO PERFORM A "DESIGN OF EXPRIMENTS" DETERMINATION OF SENSITIVITY TO PARAMETRIC VARIATION IN COMPONENTS. THE INFORMATION LEARNED WILL BE USED TO SELECT COMPONENTS THAT WILL HAVE A LONGER LIFE, AND GREATER DURABILITY. THIS FORM OF ANALYSIS COMBINED WITH WORST CASE SENSITIVITY ANALYS ...

    SBIR Phase I 1994 Department of Commerce
  5. COMBINED OBJECT-ORIENTED AND NEURAL NETWORK APPROACHES FOR SPATIAL DATA MODELS

    SBC: Quba Inc.            Topic: N/A

    RECENT DEVELOPMENTS EMPLOYING OBJECT-ORIENTED DATA MODELS HAVE DEMONSTRATED THE FEASIBILITY OF REPRESENTING COMPLEX AND ABSTRACT CARTOGRAPHIC FEATURES AS COMPOSITES OF SIMPLER FEATURES. SEPARATE DEVELOPMENTS IN NEURAL-NETWORK TECHNOLOGY HAVE SHOWN PROMISE IN RECOGNIZING OR EXTRACTING SPATIAL FEATURES WITHIN SAMPLE DATA SETS. COMBINING OBJECT-ORIENTED AND NEURAL-NETWORKS APPROACHES MAY LEAD TO NEW ...

    SBIR Phase II 1994 Department of Commerce
  6. AN ASSESSMENT AND TEACHING TOOL FOR NATIONAL EDUCATION GOALS

    SBC: Research Development Corporation            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Commerce
  7. ROLE-BASED ACCESS CONTROL

    SBC: Seta Corp.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Commerce
  8. DIODE LASER ABSOLUTE MOISTURE SENSOR

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Commerce
  9. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  10. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government