List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. "An Object Oriented Network Data Model for Transportation GIS"

    SBC: Gis/trans, Ltd            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  2. "MAGLEV OPTICAL DETECTION OF OBSTACLES (MODO)"

    SBC: Aspen Systems, Inc.            Topic: N/A

    THE REALIZATION OF SAFE, HIGH-SPEED MAGLEV OR STEEL WHEEL GROUND TRANSPORTATION WILL REQUIRE A RELIABLE SYSTEM TO DETECT OBSTACLES IN THE GUIDEWAY AT A CONSIDERABLE DISTANCE. REQUIREMENTS INCLUDE ALL-WEATHER OPERATION, DAY TIME AND NIGHT TIME OPERATION, AND THE DETECTION OF OBSTACLES AROUND THE GUIDEWAY CURVE (NOT IN LINE OF SIGHT). IN ADDITION THE SYSTEM MUST BE SAFE FOR PASSENGERS ON THE TRAIN, ...

    SBIR Phase II 1994 Department of Transportation
  3. "Photistors": Optoelectronic Switches

    SBC: Spire Corporation            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency
  4. "Rolling Deflectometer"

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  5. 1-3 Micron Tunable Diode Pumped Solid State Laser Sources

    SBC: Aculight Corporation            Topic: N/A

    High pulse energy, high repetition rate, tunable, narrowband sources are needed for optical pumping of mid-infrared gas laser converters. The source needs continuous tunability over the 1-3 micron band to access different overtone bands in various gaseous gain media. Due to the need for diode pumping of the source, efficiency is critical to minimizing diode costs. Our approach is efficient gene ...

    SBIR Phase II 1996 Department of DefenseAir Force
  6. 123I RADIOPHARMACEUTICAL PRODUCTION SYSTEM

    SBC: SCIENCE RESEARCH LABORATORY, INC            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Health and Human Services
  7. 2 TO 3 MICRON INGAAS DETECTOR ARRAYS

    SBC: Spire Corporation            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  8. 2.3 Micrometer Sensitive, High Speed, Extended InGaAs Avalanche Photodiodes

    SBC: Spire Corporation            Topic: N/A

    In Phase I, Spire will epitaxially grow, fabricate, and test two types of avalanche photodiodes (APDs) using 0.55 eV (2.3 mm cutoff wavelength) indium gallium arsenide In0.72Ga0.28As. This material will be "extended" past the common 0.74 eV lattice-matched In0.53Ga0.47As by use of an InxGa1-xAs grading layer. One APD type will have both absorption and multiplication/junction regions in the 0.55 ...

    SBIR Phase I 1996 Department of DefenseAir Force
  9. 3-5 UM INTLAS DETECTOR ARRAYS WITH MINIMUM COOLING REQUIREMENTS

    SBC: Spire Corporation            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  10. 3-D Graphite-Copper Composite Heat Exchanger

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    Foster-Miller proposes a 3-D graphite-copper (Gr/Cu) composite to meet the strength and transverse thermal conductivity criteria set forth in the solicitation. In conjunction with the NASP office of Rocketdyne, Phase I will develop this unique composite to replace the current NARloy Z heat exchanger for the NASP ramjet inlet. The 3-D Gr/Cu composite is comprised of a 2-D graphite fiber textile in ...

    SBIR Phase I 1994 Department of DefenseAir Force

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government