You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  2. Advanced Water Sensor for Unmanned Aerial Vehicles

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  3. A FIBER OPTIC PRESSURE SENSOR FOR USE IN WELLBORES

    SBC: Optech            Topic: N/A

    PRESSURE MEASUREMENTS DEEP IN GEOTHERMAL WELLBORES PROVIDE SOME OF THE MOST VALUABLE DATA FOR MEASURING THE PRODUCTIVITY OF GEOTHERMAL WELLS AND FOR ASSESSING RESERVOIRCHARACTERISTICS. WELLBORES HAVE VERY HIGH PRESSURE AND VERY LOW PH, BUT, MOST SIGNIFICANTLY, THEY HAVE VERY HIGH TEMPERATURES (UP TO 350 DEGREES CENTIGRADE) THAT PRECLUDE PRESENT PRESSURE MEASURING INSTRUMENTATION FROM OPERATING ADE ...

    SBIR Phase I 1988 Department of Energy
  4. A FRAMEWORK FOR A GENERAL PURPOSE INTELLIGENT CONTROL SYSTEM FOR PARTICLE ACCELERATORS

    SBC: Vista Control Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  5. A HIGH POWER MICROWAVE AMPLIFIER BASED ON TRANSVERSE MODULATION

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  6. A HIGH POWER SOLID-STATE AMPLIFIER

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  7. A HIGH POWER THICK TARGET DESIGN FOR IRRADIATION BY HIGH INTENSITY CHARGED PARTICLE BEAMS

    SBC: Amparo Corp.on            Topic: N/A

    PHASE I ADDRESSES A NEW APPROACH FOR THE DESIGN OF HIGH POWER NUCLEAR TARGETS USED FOR PRODUCTION OF RADIOISOTOPES BY HIGH ENERGY CHARGED PARTICLE BEAMS, NOTABLY HIGH ENERGY PROTONS. SUCH TARGETS WILL YIELD LARGER QUANTITIES OF RADIOACTIVE SPECIES THAN PRESENTLY AVAILABLE, EITHER FOR BASIC RESEARCH (E.G., STUDIES USING RADIOACTIVE BEAMS) OR FOR APPLIED PURPOSES (E.G., PRODUCTION OF MEDICAL RADIOI ...

    SBIR Phase I 1994 Department of Energy
  8. A Micro-Pulse Electron Injector

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  9. A MULTIMEDIA-AUGMENTED SOFTWARE TUTORIAL FOR THE HIGH ACCEPTANCE RECOIL POLARIMETER DEVICE

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    THIS PROJECT WILL ASSESS THE FEASIBILITY OF USING MULTIMEDIA-AUGMENTED SOFWEARE TUTORIALS TO SUPPORT TEACHING THE PRINCIPLES OF EXPERIMENTAL NUCLEAR PHYSICS. THE DETECTOR SYSTEM FOR THE PHOTON TAGGING FACILITY AT THE CONTINUOUS ELECTRON BEAM ACCELERATOR FACILITY (CEBAF) IN NEWPORT NEWS, VIRGINIA IS NOW UNDER CONSTRUCTION AT THE NUCLEAR DETECTOR LABORATORY OF THE CENTER FOR NUCLEAR STUDIES OF THE ...

    SBIR Phase I 1994 Department of Energy
  10. A MULTIMEDIA TUTORIAL FOR CHARGED-PARTICLE BEAM DYNAMICS

    SBC: Whistlesoft Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
US Flag An Official Website of the United States Government