You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. WEIGHING TRUCK COMBINATIONS IN MOTION, SOLELY ON THE TRACTOR

    SBC: Airsport Corp.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Transportation
  2. Non-Eroding Fin Materials

    SBC: Applied Research Associates, Inc.            Topic: N/A

    This project will analyze and select promising materials and designs to be used in the plumes of tactical solid rocket motors for missile steering and control. The emphasis is on high-performance refractory materials and compatibility of material systems. The control fins experience severe thermal and severe particulate erosion environments. Missile controllability requires fins with minimal er ...

    SBIR Phase I 1996 Department of DefenseArmy
  3. "Rolling Deflectometer"

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  4. Small Lot Repair/Manufacture of Microcircuit Boards by Laser Deposition

    SBC: Cm Consulting            Topic: N/A

    The final prototype of the Microcircuit Board Repair apparatus will be capable of laying down or lifting metal strips with micrometer dimensions. Under real time computer control, the translation stages will be fully automated or manually controlled. The end user will monitor the process in real time using a camera attached with the source. Laying down the metal lines will be done using Laser C ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  5. Reactor for Control of Fugitive Emissions of Toxic Gases

    SBC: Coyote Aerospace/high Mesa            Topic: N/A

    A need to control the fugitive emissions of hazardous vapors, volatile organic compounds (VOCs) and hazardous air pollutants (HAPs) has been identified in operations at Army plants and depots. The High Mesa Technologies (HMT)/Coyote Aerospace team proposes to meet this need using proven silent discharge plasma (SDP) techniques, developed by the Electric Power Research Institute and Los Alamos Nat ...

    SBIR Phase I 1997 Department of DefenseArmy
  6. Numerical Simulation of Dynamic Stall

    SBC: Ecodynamics Research Associate            Topic: N/A

    The objective of the proposed program is to develop, demonstrate and validate a three-dimensional, time-dependent, compressible Navier-Stokes program for predicting dynamic stall. The foundation of the program is an existing 3-D program that has been developed under prior SBIR funding for retreating-blade dynamic stall on modern high-performance helicopter rotors. The program will be improved in ...

    SBIR Phase I 1996 Department of DefenseArmy
  7. RESTRICTED VISIBILITY WARNING SYSTEM

    SBC: Ecotek International            Topic: N/A

    ECOTEK INTERNATIONAL PROPOSES AN ALL SOLID-STATE VISIBILITY MONITORING SYSETM THAT WILL BE USED TO MONITOR VISIBILITY CONDITIONS ALONG ROADWAYS AND WARN TRAVELERS OF LOW VISIBILITY CONDITIONS. THE PURPOSE OF THE SYSTEM IS TO REDUCE THE NUMBER OF MULTIPLE-VEHICLE COLLISIONS AND CONSEQUENT FATALITIES, INJURIES, AND PROPERTY DAMAGES. THE SYSTEM IS BASED ON AN INNOVATIVE APPROACH TO A WELL-ESTABLISHED ...

    SBIR Phase I 1994 Department of Transportation
  8. Resolution and Motion-Detection Enhancement Using an Oscillating Saccadi Perception System

    SBC: Intelligent Reasoning Systems (IRS)            Topic: N/A

    Intelligent Reasoning Systems (IRS) is developing an integrated active vision system (AVS) based on design principles derived from experimental analysis of mammalian visual systems. The AVS design is based on a asynchronous analog encoding of location and motion data, and a custom VLSI Hybrid Temporal Processing Element (HTPE) develped by and available soley to IRS (patent pending). The HPTE can o ...

    SBIR Phase II 1994 Department of DefenseArmy
  9. Image Processing Using Temporal Cellular Neural Networks

    SBC: Intelligent Reasoning Systems (IRS)            Topic: N/A

    This proposal addresses the development of a compact, high-speed camera system that integrates a Charge-Coupled Device (CCD) solid-state imager and a Temporal Cellular Neural Network (TCNN) (using three-dimensional TC technology) to provide real-time image processing capability for scientific and engineering applications. The integrated CCD/TCNN camera provides high-speed image collection and proc ...

    SBIR Phase II 1996 Department of DefenseArmy
  10. Exploiting Artificial Intelligence to Improve After Action Reviews for the Digitized Company Team

    SBC: Lb&m Assoc., Inc.            Topic: N/A

    The Close Combat Tactical Trainer (CCTT) after-action review (AAR) system produces a standard set of statistical displays that trainers may use to debrief exercise participants. These displays are difficult to interpret and do not readily reveal to the player unit "WHAT happened" during the battle. If unit players are able to discern "WHAT happened", there are no correlating displays to provide ...

    SBIR Phase II 1997 Department of DefenseArmy
US Flag An Official Website of the United States Government