You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. HLA Development Tools

    SBC: ACUSOFT, INC.            Topic: N/A

    AcuSoft proposes to develop a set of HLA Development Tools to assist simulation software developers in their efforts to implement the HLA. The HLA Development Tools will support the Federation Execution and Development Process (FEDEP) and present an approach to solving the problems associated with the HLA's flexible FOM data definitions. A set of data visualization tools, such as a 2D Plan View ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  2. Research and Development of a Synthetic Environment RTI

    SBC: ACUSOFT, INC.            Topic: N/A

    AcuSoft proposes to research and develop a Synthetic Environment RTI (SE-RTI). The SEDRIS initiative has established a new programming paradigm that provides lossless transmission of synthetic environment objects. The HLA has been designed to support interoperability and reuse of DoD simulations, and SEDRIS is a major component of HLA. Currently, the SEDRIS data model, APIs and format are prima ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  3. WEIGHING TRUCK COMBINATIONS IN MOTION, SOLELY ON THE TRACTOR

    SBC: Airsport Corp.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Transportation
  4. "Rolling Deflectometer"

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  5. Small Lot Repair/Manufacture of Microcircuit Boards by Laser Deposition

    SBC: Cm Consulting            Topic: N/A

    The final prototype of the Microcircuit Board Repair apparatus will be capable of laying down or lifting metal strips with micrometer dimensions. Under real time computer control, the translation stages will be fully automated or manually controlled. The end user will monitor the process in real time using a camera attached with the source. Laying down the metal lines will be done using Laser C ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  6. RESTRICTED VISIBILITY WARNING SYSTEM

    SBC: Ecotek International            Topic: N/A

    ECOTEK INTERNATIONAL PROPOSES AN ALL SOLID-STATE VISIBILITY MONITORING SYSETM THAT WILL BE USED TO MONITOR VISIBILITY CONDITIONS ALONG ROADWAYS AND WARN TRAVELERS OF LOW VISIBILITY CONDITIONS. THE PURPOSE OF THE SYSTEM IS TO REDUCE THE NUMBER OF MULTIPLE-VEHICLE COLLISIONS AND CONSEQUENT FATALITIES, INJURIES, AND PROPERTY DAMAGES. THE SYSTEM IS BASED ON AN INNOVATIVE APPROACH TO A WELL-ESTABLISHED ...

    SBIR Phase I 1994 Department of Transportation
  7. AN ULTRA-HIGH PRECISION POSITIONING AND BATHYMETRIC SURVEYING SYSTEMS

    SBC: Marisys, Inc.            Topic: N/A

    THERE IS A SIGNIFICANT REQUIREMENT FOR BATHYMETRIC INFORMATION WITH ENOUGH PRECISION IN THE VERTICAL AXIS (ELEVATION) TO ASSES LONG TERM PROCESSES SUCH AS SCOUR, SILTING, SUBSIDENCE AND OTHER SUBTLE FLUCTUATIONS I BOTTOM TOPOGRAPHY. PRODUCING HIGHLY ACCURATE BATHYMETRIC SURVEYS IS COSTLY AND ERROR PRONE. MODERN SURVEY SYSTEMS CAN PRODUCE RESULTS ACCURATE TO WITHIN A FEW DECIMETERS IN THE HORIZONTA ...

    SBIR Phase I 1994 Department of Transportation
  8. A PILOTING ADVISOR BASED UPON COMPUTATIONAL INTELLIGENCE AND ECDIS TECHNOLOGY

    SBC: Marisys, Inc.            Topic: N/A

    INLAND WATERWAYS AND TERMINAL FACILITIES ARE BECOMING MORE AND MORE CONGESTED, RESULTING IN INCREASED RISKS OF COLLISIONS AND GROUNDINGS. DUE TO ECONOMIC AND ENVIRONMENTAL CONSIDERATIONS IT IS GENERALLY NOT FEASIBLE TO EXPAND WATERWAYS OR TERMINALS IN CURRENTLY CONGESTED AREAS. ONE WAY TO MEET THE DEMAND FOR INCREASED SHIPPING TONNAGE IS TO IMPROVE THE PRECISION OF PILOTING COMMERCIAL VESSELS. ELE ...

    SBIR Phase I 1994 Department of Transportation
  9. Porous Sol-Gel Derived Ceramic Release Agent

    SBC: TPL, INC            Topic: N/A

    Breathable release coatings that can withstand processing conditions up to 750F are needed for use on ceramic tooling. In situ removal of volatiles in solvent-based composite processing is a critical issue that will enable production of high quality parts at lower cost per part. Current release coatings meet neither the temperature nor the solvent transport requirements of solvent-based composit ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  10. The Application of Advanced Technology to Traffic Enforcement

    SBC: Anacapa Sciences            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
US Flag An Official Website of the United States Government