You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
WEIGHING TRUCK COMBINATIONS IN MOTION, SOLELY ON THE TRACTOR
SBC: Airsport Corp. Topic: N/AN/A
SBIR Phase I 1994 Department of Transportation -
"Rolling Deflectometer"
SBC: Applied Research Associates, Inc. Topic: N/AN/A
SBIR Phase II 1996 Department of Transportation -
AIRCRAFT INSPECTOR VISUAL TRAINING PROGRAMS USING COMPUTER-ENHANCED IMAGES
SBC: Blackmon & Assoc Topic: N/ADEMONSTRATE THE FEASIBILITY OF TRAINING AND UPGRADING AIRCRAFT INSPECTOR SKILLS THROUGH THE USE OF COMPUTER ENHANCED IMAGES OF AIRCRAFT COMPONENTS IN A CONTROLLED INSTRUCTIONAL ENVIRONMENT.
SBIR Phase I 1994 Department of Transportation -
Small Lot Repair/Manufacture of Microcircuit Boards by Laser Deposition
SBC: Cm Consulting Topic: N/AThe final prototype of the Microcircuit Board Repair apparatus will be capable of laying down or lifting metal strips with micrometer dimensions. Under real time computer control, the translation stages will be fully automated or manually controlled. The end user will monitor the process in real time using a camera attached with the source. Laying down the metal lines will be done using Laser C ...
SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense -
RESTRICTED VISIBILITY WARNING SYSTEM
SBC: Ecotek International Topic: N/AECOTEK INTERNATIONAL PROPOSES AN ALL SOLID-STATE VISIBILITY MONITORING SYSETM THAT WILL BE USED TO MONITOR VISIBILITY CONDITIONS ALONG ROADWAYS AND WARN TRAVELERS OF LOW VISIBILITY CONDITIONS. THE PURPOSE OF THE SYSTEM IS TO REDUCE THE NUMBER OF MULTIPLE-VEHICLE COLLISIONS AND CONSEQUENT FATALITIES, INJURIES, AND PROPERTY DAMAGES. THE SYSTEM IS BASED ON AN INNOVATIVE APPROACH TO A WELL-ESTABLISHED ...
SBIR Phase I 1994 Department of Transportation -
Porous Sol-Gel Derived Ceramic Release Agent
SBC: TPL, INC Topic: N/ABreathable release coatings that can withstand processing conditions up to 750F are needed for use on ceramic tooling. In situ removal of volatiles in solvent-based composite processing is a critical issue that will enable production of high quality parts at lower cost per part. Current release coatings meet neither the temperature nor the solvent transport requirements of solvent-based composit ...
SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense -
Electrical Ground Loops in Heavy Trucks
SBC: Vehicle Enhancement Systems, Topic: N/AThe number of electrical/electronic devices in heavy-duty vehicles are increasing rapidly. Many of these devices require a "clean" source of power, which may theoretically be supplied by a separate ground. Currently, tractors operate on one of three grounding methods, the frame ground being the most common. However, the introduction of a separate ground into the trailer could lead to serious gr ...
SBIR Phase I 1996 Department of Transportation