You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. High Throughput Multiple Access Digital Wireless Communications

    SBC: AIMS, INC.            Topic: N/A

    We propose a radically innovative approach to the problem of multiple access communication which promises to revolutionize the modern communication industry by dramatically increasing network throughput. Our approach is based upon two major novel components: (i) hybrid time-frequency allication of communication channel resources, and(ii) non-orthogonal, i.e., overlaping, multiplexed signals. Toge ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  2. Nuclear Weapons Effects Phenomenology

    SBC: Applied Physics Technologies            Topic: N/A

    The nuclear weapons community has traditionally focused on the next generation or level of weapon capability complimented by gathering and analysis of actual test data. Now, with the cessation of actual weapons testing, there is an increased need to use the actual test data in modeling techniques to better understand the phenomenology and potential effects of nuclear weapons. The first phase of ...

    SBIR Phase I 1997 Department of DefenseDefense Threat Reduction Agency
  3. Laser Turbulence Measurements in the LB/TS

    SBC: Applied Research Associates, Inc.            Topic: N/A

    Turbulence of gas flows by its very nature is one of the most difficult things to model and measure. We propose to develop a new way of measuring the turbulence and to compare these measurements to predictions using the k-epsilon model. Typical measurements, in the past, use smoke, Schlierin or shadow graph techniques to visually infer turbulence characteristics. These features are either motio ...

    SBIR Phase I 1997 Department of DefenseDefense Threat Reduction Agency
  4. Advanced Six-Degree-of-Freedom (6-D) Laser Measurement System

    SBC: AUTOMATED PRECISION, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  5. Commercial Game Development Using HLA and SEDRIS

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    Significant similarities exist between DoD simulation applications and networked simulation games developed for entertainment. To date, however, there has been no compelling reason for commercial game developers to adopt DoD methods and standards. Interestingly, HLA compares favorably to current commercial solutions like Microsoft's DirectPlay. There is clear benefit to DoD if HLA is embraced b ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  6. Small Lot Repair/Manufacture of Microcircuit Boards by Laser Deposition

    SBC: Cm Consulting            Topic: N/A

    The final prototype of the Microcircuit Board Repair apparatus will be capable of laying down or lifting metal strips with micrometer dimensions. Under real time computer control, the translation stages will be fully automated or manually controlled. The end user will monitor the process in real time using a camera attached with the source. Laying down the metal lines will be done using Laser C ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  7. ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.

    SBC: Corpe Corp.            Topic: N/A

    AT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  8. Modeling Enhanced Energy Release in Turbulent Exothermic Flows in Closed Chambers by an Inverse Meth

    SBC: Enig Associates, Inc.            Topic: N/A

    Toward understanding how turbulent mixing with air of detonation products of fuel-rich explosives results in further combustion of the detonation products and, therefore, enhanced lethality, we first consider an exothermic reaction of a premixed fuel/oxidizer in a closed vessel in the limit of zero Mach number and infinite Reynolds, Peclet, and Damkohler numbers. To help elucidate the main mechan ...

    SBIR Phase I 1997 Department of DefenseDefense Threat Reduction Agency
  9. ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM

    SBC: EPOCH ENGINEERING, INC.            Topic: N/A

    WHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  10. DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA

    SBC: Frh, Inc.            Topic: N/A

    CHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government