You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. HLA Development Tools

    SBC: ACUSOFT, INC.            Topic: N/A

    AcuSoft proposes to develop a set of HLA Development Tools to assist simulation software developers in their efforts to implement the HLA. The HLA Development Tools will support the Federation Execution and Development Process (FEDEP) and present an approach to solving the problems associated with the HLA's flexible FOM data definitions. A set of data visualization tools, such as a 2D Plan View ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  2. Research and Development of a Synthetic Environment RTI

    SBC: ACUSOFT, INC.            Topic: N/A

    AcuSoft proposes to research and develop a Synthetic Environment RTI (SE-RTI). The SEDRIS initiative has established a new programming paradigm that provides lossless transmission of synthetic environment objects. The HLA has been designed to support interoperability and reuse of DoD simulations, and SEDRIS is a major component of HLA. Currently, the SEDRIS data model, APIs and format are prima ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  3. High Throughput Multiple Access Digital Wireless Communications

    SBC: AIMS, INC.            Topic: N/A

    We propose a radically innovative approach to the problem of multiple access communication which promises to revolutionize the modern communication industry by dramatically increasing network throughput. Our approach is based upon two major novel components: (i) hybrid time-frequency allication of communication channel resources, and(ii) non-orthogonal, i.e., overlaping, multiplexed signals. Toge ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  4. Advanced Six-Degree-of-Freedom (6-D) Laser Measurement System

    SBC: AUTOMATED PRECISION, INC.            Topic: N/A

    In order to remain competitive in today's global marketplace, U.S. manufacturers are constantly striving to hold tighter and tighter tolerances on the parts that they produce. What this means is that the manufacturer needs to better control the machines that they use, and in order to do that they need an instrument that can quickly and easily characterize the geometric properties of the machines ...

    SBIR Phase II 1997 Department of DefenseOffice of the Secretary of Defense
  5. Advanced Six-Degree-of-Freedom (6-D) Laser Measurement System

    SBC: AUTOMATED PRECISION, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  6. Cost-effective Optical Correlator for Security Applications

    SBC: BOULDER NONLINEAR SYSTEMS, INC.            Topic: N/A

    Pattern recognition systems using optical correlation are being developed. The optical correlator is a powerful tool since it simultaneously processes large data arrays. This capability reduces data handling and process control, makes the system less susceptable to obstruction and increases throughput. An optical correlator is also a phase sensitive detector. It can read an optical phase mask ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  7. Small Lot Repair/Manufacture of Microcircuit Boards by Laser Deposition

    SBC: Cm Consulting            Topic: N/A

    The final prototype of the Microcircuit Board Repair apparatus will be capable of laying down or lifting metal strips with micrometer dimensions. Under real time computer control, the translation stages will be fully automated or manually controlled. The end user will monitor the process in real time using a camera attached with the source. Laying down the metal lines will be done using Laser C ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  8. Extensible Beamformer for Portable Imaging Sonar

    SBC: Q-DOT, INC.            Topic: N/A

    Q-DOT proposes to develop a unizue, lower-power, low-cost beamformer for portable imaging sonars. The original two chip set will form 100 beams from 100 input channels. A 0.3 cm2 BiCMOS chip comprises a low noise amplifier (LNA), a time-gain control (TGC), an apodizer and a Delta-Signma modulation (ADC) for each channel. A 0.66 cm2 CMOS chip accepts 100 digital input channels and produces 100 d ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  9. A Two-Dimensional Avalanche Photodiode Array Suitable for Near IR LADAR

    SBC: Silicon Mountain Design, Inc.            Topic: N/A

    SMD proposes the design and fabrication of a two-dimensional APD array. A novel APD array is proposed which requires low bias voltages, thus making it compatible with both CMOS and CCD multiplexer designs. The on-chip CMOS/CCD circuitry will allow for multiplexing of a large number of pixels to a single output. Further, each pixel in the APD array will have its own range detection circuitry allo ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  10. Porous Sol-Gel Derived Ceramic Release Agent

    SBC: TPL, INC            Topic: N/A

    Breathable release coatings that can withstand processing conditions up to 750F are needed for use on ceramic tooling. In situ removal of volatiles in solvent-based composite processing is a critical issue that will enable production of high quality parts at lower cost per part. Current release coatings meet neither the temperature nor the solvent transport requirements of solvent-based composit ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government