Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. Knowledge-aided Interface for Big Data Streams

    SBC: SECURBORATION, INC.            Topic: OSD13LD2

    Big data challenges across Department of Defense (DOD) domains are increasingly problematic for tactical level decision making. Data collections in the open source and military channels are growing at such a staggering rate that it exceeds our ability to store and manage, perform computation and analysis, and maintain data security [1, 2]. Indeed, one author refers to the inability to handle big ...

    SBIR Phase II 2015 Department of DefenseOffice of the Secretary of Defense
  2. Commercial Verde

    SBC: Fernandez, Steven            Topic: 851

    Public and commercial application of NOAA developed products such as climate observations, weather products, and datasets are underutilized by public decision makers, infrastructure asset owners, or the public. Communities realize the risk posed by increases in storm intensity, flooding, and heat waves. However, communities lack understandable models targets to stakeholder questions that are affor ...

    SBIR Phase I 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Ultra High Sensitivity SWIR Methane Imaging Camera

    SBC: AMETHYST RESEARCH INCORPORATED            Topic: 861X

    Methane, is the third most prevalent greenhouse gas whose atmosphere concentration is currently over 1.7 ppm. Methane is about 21 times more potent when compared to CO2. Even though its concentration in the atmosphere is more than 200 times lower than carbon dioxide, methane is responsible for 20% of the greenhouse effect. The main natural resources for methane include wetlands, termites and the o ...

    SBIR Phase I 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  4. Portable high precision nitrogen gas analyzer for eddy covariance flux measurements

    SBC: Southwest Sciences, Inc.            Topic: 861X

    Recent theoretical studies of eddy flux correlation have suggested that the commonly used assumption of dry air having no net flux is erroneous and can lead to significant errors in reported observations. Presently, dry air density is calculated indirectly from measured temperature, pressure and relative humidity, all of which contribute to increased uncertainties in the result. If instead the den ...

    SBIR Phase I 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  5. Advanced Heavy Fuel Injection System for UAS/UGS Applications

    SBC: MAINSTREAM ENGINEERING CORPORATION            Topic: OSD13PR1

    This effort is to develop a fast responding, light weight, direct injection system to operate within the fuels ignition delay time for UAS/UGS application. These systems must be applicable to engines that are 200 HP or less, either reciprocating or rotary. A technical challenge associated with the conversion of gasoline engines to heavy fuel (JP-8) is the avoidance of knock. An approach used to ...

    SBIR Phase II 2015 Department of DefenseOffice of the Secretary of Defense
  6. Large-Area, High-Uniformity Photodiodes for Infrared Trap Detectors

    SBC: AMETHYST RESEARCH INCORPORATED            Topic: 9020168R

    methyst Research Inc. will design, fabricate and test a high uniformity, large area, low noise infrared trap-detector detector for the 1- 4.5 μm wavelength range. This state of the art detector will have a large area (e.g., 1-1.8 cm diameter active area) with a spatial variability of internal quantum efficiency of less than 0.1 % between 1 μm and 4.5 μm. In addition, the internal quantum effici ...

    SBIR Phase I 2015 Department of CommerceNational Institute of Standards and Technology
  7. Cognitive Residential Heat Pumps Fault Detection and Diagnostic Datalogger

    SBC: MANAGEMENT SCIENCES INC            Topic: 9010173R

    During Phase I, Management Sciences, Inc. (MSI) proved feasibility of adapting their current technology into a product capable of improving performance resulting in increased efficiency and extended life cycles of heat pumps. The resultant product is a tool named the Heat Pump Sentient (HP-Sentient). The HP-Sentient will improve performance and reduce maintenance costs through aggressive goal-seek ...

    SBIR Phase II 2015 Department of CommerceNational Institute of Standards and Technology
  8. Secure Email Agent Using the Domain Name System (DNS) as a Trust Infrastructure

    SBC: GRIER FORENSICS, LLC            Topic: 9020377R

    Although protocols for securing email have been available for over twenty years, these protocols, by nature of their use of asymmetric cryptography, require users to have the public key or certificate of the correspondents. Grier Forensics will develop technology to use the Domain Name System (DNS) to distribute certificates and keys, making email secure, authenticated, and confidential, curbing t ...

    SBIR Phase II 2015 Department of CommerceNational Institute of Standards and Technology
  9. Optimized CO2 Gas Sensor for Autonomous Measurement of Ocean Carbon

    SBC: DIOXIDE MATERIALS, INC.            Topic: 822R

    The objective of the proposed work is to create low cost, low power sensors for autonomous measurement of ocean carbon. In our Phase I effort, we showed that Dioxide Materials’ miniature CO2 sensors have the speed and sensitivity to meet NOAA’s requirements for sensing ocean carbon. The objective of the proposed work is to further develop the sensors so that they can be used directly in NOAA ...

    SBIR Phase II 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  10. High Efficiency Electric Power Manager for Man-Portable Photovoltaic Systems

    SBC: APECOR CORP            Topic: OSD13EP2

    Renewable energy, specifically photovoltaic, is an attractive technology for man-portable power sources and tactical applications. However, to be effective as a system, it is necessary to have a power manager that can efficiently couple a small solar array (~20W) to a battery such as the BB2590. Power managers are already being fielded with PV sources, but their usefulness has been limited by the ...

    SBIR Phase II 2015 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government