You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A TRIMODE POWER PROCESSOR TO OPTIMIZE PHOTOVOLTAIC, BATTERY, AND DIESEL-GENERATOR SOURCES FOR ECONOMIC STAND-ALONE POWER PLANTS

    SBC: Abacus Controls, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  2. HLA Development Tools

    SBC: ACUSOFT, INC.            Topic: N/A

    AcuSoft proposes to develop a set of HLA Development Tools to assist simulation software developers in their efforts to implement the HLA. The HLA Development Tools will support the Federation Execution and Development Process (FEDEP) and present an approach to solving the problems associated with the HLA's flexible FOM data definitions. A set of data visualization tools, such as a 2D Plan View ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  3. Research and Development of a Synthetic Environment RTI

    SBC: ACUSOFT, INC.            Topic: N/A

    AcuSoft proposes to research and develop a Synthetic Environment RTI (SE-RTI). The SEDRIS initiative has established a new programming paradigm that provides lossless transmission of synthetic environment objects. The HLA has been designed to support interoperability and reuse of DoD simulations, and SEDRIS is a major component of HLA. Currently, the SEDRIS data model, APIs and format are prima ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  4. A Three Dimensional Flow Parallel-Processing System for Fast Programmable Real-Time Applications

    SBC: 3D-Computing, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Energy
  5. Ultrafast Polysilylene Scintillators

    SBC: Adherent Technologies, Inc.            Topic: N/A

    40640 November 12, 1996 Adherent Technologies, Inc. Scintillators have been used for over 90 years to detect ionizing radiation, but solid organic scintillator, commonly used in physics experimentation, suffer from errors caused by pulse pileup. To minimize this problem, this project will examine a new class of polymeric materials which also offer the po ...

    SBIR Phase II 1997 Department of Energy
  6. Ultrafast Polysilylene Scintillators

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  7. Direct Adhesive Technology for Arbitrary Conductors

    SBC: Advanced Magnet Lab, Inc.            Topic: N/A

    168 Direct Adhesive Technology for Arbitrary Conductors--Advanced Magnet Laboratory, Inc., 2730 Kirby Avenue, NE, Unit #5, Palm Bay, FL 32905-3402; (407) 728-7543 Dr. Rainer D. Meinke, Principal Investigator Mr. Mark W. Senti, Business Official DOE Grant No. DE-FG02-97ER82312 Amount: $74,839 The Direct Wire technology enables economic manufacturing of complex magnet coils by instantaneously ...

    SBIR Phase I 1997 Department of Energy
  8. A HIGH POWER THICK TARGET DESIGN FOR IRRADIATION BY HIGH INTENSITY CHARGED PARTICLE BEAMS

    SBC: Amparo Corp.on            Topic: N/A

    PHASE I ADDRESSES A NEW APPROACH FOR THE DESIGN OF HIGH POWER NUCLEAR TARGETS USED FOR PRODUCTION OF RADIOISOTOPES BY HIGH ENERGY CHARGED PARTICLE BEAMS, NOTABLY HIGH ENERGY PROTONS. SUCH TARGETS WILL YIELD LARGER QUANTITIES OF RADIOACTIVE SPECIES THAN PRESENTLY AVAILABLE, EITHER FOR BASIC RESEARCH (E.G., STUDIES USING RADIOACTIVE BEAMS) OR FOR APPLIED PURPOSES (E.G., PRODUCTION OF MEDICAL RADIOI ...

    SBIR Phase I 1994 Department of Energy
  9. High Power Target Design for a Next Generation Radioactive Beam ISOL-Type Facility

    SBC: Amparo Corp.on            Topic: N/A

    40063 November 4, 1996 Amparo Corporation First-generation radioactive beam facilities, in use or under construction, cannot completely address many of the scientific opportunities envisioned until an intense production beam is employed. This project addresses a key element in filling this need, the design of high power nuclear targets. The targe ...

    SBIR Phase II 1997 Department of Energy
  10. High Power Target Design for a Next Generation Radioactive Beam ISOL-Type Facility

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
US Flag An Official Website of the United States Government