You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Militarized Power Line Communication

    SBC: 5-D SYSTEMS, INC.            Topic: OSD12EP7

    Significant energy is required to operate and maintain the extensive U.S. military mission around the world. This equates to significant costs to the country. Smart power microgrids have proven to significantly increase efficiency, as well as enable the u

    SBIR Phase II 2014 Department of DefenseOffice of the Secretary of Defense
  2. Data Fusion Approach for the Effective Inspection of Prestressed Concrete

    SBC: FDH Engineering Inc.            Topic: 141FH1

    While many inspection technologies are available to find corrosion in steel tendons of prestressed concrete, no single technology has shown consistent results over the wide range of prestressed structures and inspection settings that are required from the bridge infrastructure market. However, a new NDE method – Nonlinear Impact Resonance Spectroscopy (NIRS) – shows promise in identifying corr ...

    SBIR Phase I 2014 Department of Transportation
  3. Autonomy Management Platform

    SBC: Traclabs Inc.            Topic: OSD12HS1

    Autonomous vehicles are becoming more and more integral to our nation's defense. There is a desire to increase the autonomy of these vehicles and enable humans to delegate those tasks that are more effectively done by computer. Achieving this will require

    SBIR Phase II 2014 Department of DefenseOffice of the Secretary of Defense
  4. Coalition of Operators and Automation for Collaborative Tasking (COACT)

    SBC: Traclabs Inc.            Topic: OSD13HS5

    Increasing the autonomy of unmanned vehicles potentially reduces operator workload and cognitive load. Realizing the promise of autonomy however, is difficult when deploying in environments with mobility and visibility challenges, enemy threats, risks of endangering civilians, and limited communication. Achieving full autonomy in the face of these challenges is both a hard technical problem and do ...

    SBIR Phase I 2014 Department of DefenseOffice of the Secretary of Defense
  5. Fashioning of an Adaptive Workspace through Autonomous Services

    SBC: SECURBORATION, INC.            Topic: OSD12AU5

    During Phase I of this research, the Securboration Team prototyped the Adaptive Data Immersion ENvironment (ADIEN) and demonstrated groundbreaking capability in adaptive human machine collaboration one in which the computer learns, adapts, and informs analysts based on their practices, situational context, and data content. ADIEN provides a unique and innovative system that is data centric in ter ...

    SBIR Phase II 2014 Department of DefenseOffice of the Secretary of Defense
  6. Recognizing Event Attributes in Unstructured Text (REACT)

    SBC: LANGUAGE COMPUTER CORPORATION            Topic: OSD12LD5

    During REACT Phase II LCC will develop an end-to-end autonomous system to extract many types of attributes for all types of events from large amounts of unstructured text with state-of-the-art accuracy, with the overall goal of making sure this information is structured in a way that can easily be used by human analysts or by other intelligence applications.

    SBIR Phase II 2014 Department of DefenseOffice of the Secretary of Defense
  7. Deep Analytics for Data in Cyber-Physical Systems

    SBC: VIGILANT CYBER SYSTEMS, INC.            Topic: OSD13LD1

    Visual Analytics Managers (VAMs) for Cyber-Physical Systems (CPS) will allow users to gain insight into the CPS with state-of-the-art analytics and artificial intelligence and provide human-in-the-loop interaction with the CPS. Our VAM toolkit builds around a Scala Akka actor framework, allowing designers to define the sensors and actuators present in the CPS, select from a rich set of analytic ...

    SBIR Phase I 2014 Department of DefenseOffice of the Secretary of Defense
  8. Improved Turbo/Superchargers for UAS/UGS Application

    SBC: Florida Turbine Technologies Inc.            Topic: OSD13PR5

    Florida Turbine Technologies proposes an oil-free bearing shaft support system for an Unmanned Aerial System (UAS) internal combustion (IC) engine turbocharger. During the course of Phase 1, FTT will design a light-weight high performance UAS turbocharger for IC engines in the 150 horsepower class. A conceptual design of the turbocharger system capable of providing sufficient boost pressure wil ...

    SBIR Phase I 2014 Department of DefenseOffice of the Secretary of Defense
  9. Welding High Performance Bridge Steel with a Pulsed Energy Source

    SBC: KAI, LLC            Topic: 132FH1

    This proposal is in response to announcement DTRT57-13-R-SBIR2 in the area 13.2-FH1, Development of Innovative Welding for High Performance Bridge Steel. It is proposed to use Homopolar Generator (HPG) Welding to join the high performance bridge steel in the 3” by 30” cross sections mentioned in the announcement in under 1 second. All of the energy required to perform the weld is stored in the ...

    SBIR Phase I 2014 Department of Transportation
  10. Advanced Heavy Fuel Injection System for UAS/UGS Applications

    SBC: MAINSTREAM ENGINEERING CORP            Topic: OSD13PR1

    Mainstream Engineering will use state-of-the-art technology and manufacturing processes to develop an innovative, high speed, lightweight fuel injection system capable of providing multiple injections per engine cycle at engine speeds up to 6000 RPM. To overcome the barriers associated with spark ignition of direct-injected heavy fuel (JP5, JP8, etc.), Mainstream will leverage previous internal re ...

    SBIR Phase I 2014 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government