You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Additively Manufactured Hybrid Windshields with Thermal Protection for Lightweight, Multifunctional, Hyper Velocity Projectiles

    SBC: GOODMAN TECHNOLOGIES LLC            Topic: SCO182003

    One key concern of the Strategic Capabilities Office (SCO) is the security component of the “Asia-Pacific Rebalance” where the Chinese anti-access/area denial (A2/AD) policy threatens regional security. In response to A2/AD our forces in the Pacific require more affordable and rapidly deployable alternatives to costly missile defense such as large caliber projectiles for Navy electroma ...

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
  2. AirQAST Portable Automated Air Quality Monitoring

    SBC: CREARE LLC            Topic: 18NCER2A

    Assessment of wild land fire smoke exposure is a genuine concern to fire managers, public health officials, air quality regulators, and the public. Exposure to vegetation fire smoke products poses acute and chronic health hazards to first line responders, firefighters, and to communities located downwind of their source. Current instrumentation capable of providing reliable air quality data is exp ...

    SBIR Phase I 2019 Environmental Protection Agency
  3. High Acceleration and Hypervelocity Inertial Measurement Unit

    SBC: QUALITY SUPPORT, INC.            Topic: OSD181001

    OSD solicits vendors for a ‘High Acceleration and Hypervelocity Inertial Measurement Unit System’ for use in 155mm projectiles. Development of a gun-hardened and highly miniaturized IMU would revolutionize the way in which 155mm gun systems are employed. A 155mm projectile with guidance, navigation and control would enable the development of new systems such as precision gun launched missile d ...

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
  4. Few-shot Object detection via Reinforcement Control of Image Simulation (FORCIS)

    SBC: EXPEDITION TECHNOLOGY, INC.            Topic: SCO182006

    Few-shot Object detection via Reinforcement Control of Image Simulation (FORCIS) will combine deep reinforcement learning with additional training data augmentations and strategies to develop robust few shot detectors leveraging available simulations.

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
  5. Development of a Commercial Multiple Degree of Freedom Measurement System

    SBC: American Research Corporation of Virginia            Topic: N/A

    The Multiple Degree of Freedom Measurement (MDFM) System, developed under Wright Laboratory, has been identified as having strong commercial potential as a significant enhancement to existing products in the machine tool industry for machine tool calibration or coordinate measuring machine enhancement. The MDFM is in need of revision to incorporate state-of-the-art technology, to prepare the devi ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  6. Disposable Micromachined Flow Immunoassay for Field Detection of Contaminants

    SBC: American Research Corporation of Virginia            Topic: N/A

    The use of enzyme-linked immunosorbent assay (ELISA) to detect contaminants such as solvents, fuels, and pesticides in soil and water samples is now well established. Although ELISA and related methods can facilitate analysis of samples, several washing and separation steps are involved that require 30 to 120 minutes per sample to reach equilibrium. Recently, near infrared fluorescence immunoassa ...

    SBIR Phase I 1997 Environmental Protection Agency
  7. Computer Enhanced Eddy Current Detection of Hidden Substructure Edges and Holes

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  8. Analysis and Improvement of Trivalent Chromium Conversion Coatings for Aluminum Alloys

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  9. Small Lot Repair/Manufacture of Microcircuit Boards by Laser Deposition

    SBC: Cm Consulting            Topic: N/A

    The final prototype of the Microcircuit Board Repair apparatus will be capable of laying down or lifting metal strips with micrometer dimensions. Under real time computer control, the translation stages will be fully automated or manually controlled. The end user will monitor the process in real time using a camera attached with the source. Laying down the metal lines will be done using Laser C ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  10. Liquid Crystal-Based Underwater Imager

    SBC: EMPIRICAL TECHNOLOGIES CORPORATION            Topic: N/A

    The contractor proposes a new approach to underwater imaging that directly converts a two-dimmensional acoustic pressure wave into an electronic requirements fo convential piezo-element arrays. The imager relies on the piezo-birefringent properties of a nematic liquid crystal panel that serves as both sensor and display. The capability of nematic liquid crystals has been established and publishe ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government