Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  2. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  3. Development of a Commercial Multiple Degree of Freedom Measurement System

    SBC: American Research Corporation of Virginia            Topic: N/A

    The Multiple Degree of Freedom Measurement (MDFM) System, developed under Wright Laboratory, has been identified as having strong commercial potential as a significant enhancement to existing products in the machine tool industry for machine tool calibration or coordinate measuring machine enhancement. The MDFM is in need of revision to incorporate state-of-the-art technology, to prepare the devi ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  4. Computer Enhanced Eddy Current Detection of Hidden Substructure Edges and Holes

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  5. Analysis and Improvement of Trivalent Chromium Conversion Coatings for Aluminum Alloys

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  6. Small Lot Repair/Manufacture of Microcircuit Boards by Laser Deposition

    SBC: Cm Consulting            Topic: N/A

    The final prototype of the Microcircuit Board Repair apparatus will be capable of laying down or lifting metal strips with micrometer dimensions. Under real time computer control, the translation stages will be fully automated or manually controlled. The end user will monitor the process in real time using a camera attached with the source. Laying down the metal lines will be done using Laser C ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  7. Blast Mitigation Jacket for Training

    SBC: DOMINCA LLC            Topic: N/A

    Certain weapons produce blast waves capable of trauma to gas-filled organs. There is an immediate need for a blast mitigation jacket to prevent lung damage when training with such weapons, and a similar need for combatants. Our first objective in PhaseII is to complete the research and development of fundamental blast mitigation concepts developed during Phase I. During Phase I, we used analyti ...

    SBIR Phase I 2001 Department of DefenseOffice of the Secretary of Defense
  8. Liquid Crystal-Based Underwater Imager

    SBC: EMPIRICAL TECHNOLOGIES CORPORATION            Topic: N/A

    The contractor proposes a new approach to underwater imaging that directly converts a two-dimmensional acoustic pressure wave into an electronic requirements fo convential piezo-element arrays. The imager relies on the piezo-birefringent properties of a nematic liquid crystal panel that serves as both sensor and display. The capability of nematic liquid crystals has been established and publishe ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  9. Cost effective, rapid densification of lightweight ceramic matrix composite LRE components by gas phase reaction synthesis

    SBC: EXOTHERMICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  10. Technology Enhanced Human Interface to the Computerized Patient Record

    SBC: FSCX, INC.            Topic: N/A

    FSCX will develop a methodology and system design that will lead to a Phase II SBIR prototype, which will provide automated, decision support products to improve collective performance in training and real world operations. The prototype will improveindividual and collective understanding in information intensive, digital environments. FSCX calls this prototype SpectoAgnito, a coined term meanin ...

    SBIR Phase I 2001 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government