You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.

    SBC: Corpe Corp.            Topic: N/A

    AT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  2. ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM

    SBC: EPOCH ENGINEERING, INC.            Topic: N/A

    WHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  3. DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA

    SBC: Frh, Inc.            Topic: N/A

    CHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  4. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  5. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  6. Remote Automated Atmospherics Monitoring and Prediction System

    SBC: North Dancer Labs, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseOffice of the Secretary of Defense
  7. Advanced Digital Man-Machine Interface Analysis

    SBC: Ryan Nuclear, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  8. High Throughput Multiple Access Digital Wireless Communications

    SBC: AIMS, INC.            Topic: N/A

    We propose a radically innovative approach to the problem of multiple access communication which promises to revolutionize the modern communication industry by dramatically increasing network throughput. Our approach is based upon two major novel components: (i) hybrid time-frequency allication of communication channel resources, and(ii) non-orthogonal, i.e., overlaping, multiplexed signals. Toge ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  9. Development of a Commercial Multiple Degree of Freedom Measurement System

    SBC: American Research Corporation of Virginia            Topic: N/A

    The Multiple Degree of Freedom Measurement (MDFM) System, developed under Wright Laboratory, has been identified as having strong commercial potential as a significant enhancement to existing products in the machine tool industry for machine tool calibration or coordinate measuring machine enhancement. The MDFM is in need of revision to incorporate state-of-the-art technology, to prepare the devi ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  10. Analysis and Improvement of Trivalent Chromium Conversion Coatings for Aluminum Alloys

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government