You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
N/A
SBC: 21ST CENTURY SYSTEMS, INC. Topic: N/AN/A
SBIR Phase II 1999 Department of DefenseOffice of the Secretary of Defense -
Polynomial Networks for Testing Flight Critical Systems
SBC: ABTECH CORPORATION Topic: N/AThe objective of this effort is to demonstrate a prototype model of a flight-critical system using AbTech's AIM network synthesis tool and NASA's CLIPS production rule system and to demonstrate the ability of an AIM generated polynomial network to reliably perform sensitivity analysis using variable components of this flight critical system. The resulting adaptive test generation, analysis, and co ...
SBIR Phase I 1994 National Aeronautics and Space Administration -
N/A
SBC: ABTECH CORPORATION Topic: N/AN/A
SBIR Phase II 1999 National Aeronautics and Space Administration -
Abductive Power System Control and Diagnostics
SBC: ABTECH CORPORATION Topic: N/AN/A
SBIR Phase I 1994 National Aeronautics and Space Administration -
Aim Telemetry Expert Analyst & Monitor
SBC: ABTECH CORPORATION Topic: N/AN/A
SBIR Phase II 1996 National Aeronautics and Space Administration -
MATERIAL OPTIMIZATION FOR USE WITH IN-SITU PROCESSING TECHNIQUE
SBC: ADC Acquisition Co. dba Automated Dynamics Topic: N/AN/A
SBIR Phase II 1997 National Aeronautics and Space Administration -
MATERIAL OPTIMIZATION FOR USE WITH IN-SITU PROCESSING TECHNIQUE
SBC: ADC Acquisition Co. dba Automated Dynamics Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
Low-Cost, Thermoplastic Composite Processing for Open-Section Structural Components
SBC: ADC Acquisition Co. dba Automated Dynamics Topic: N/AN/A
SBIR Phase I 1994 National Aeronautics and Space Administration -
Deployable Antennas of Open-Celled Foam Construction
SBC: Adherent Technologies, Inc. Topic: N/AN/A
SBIR Phase I 1999 National Aeronautics and Space Administration -
HIGH-TEMPERATURE FINISH FOR AMB-21 MATRIX COMPOSITES
SBC: Adherent Technologies, Inc. Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration