You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ADAPTATION AND DEVELOPMENT OF HYPERCARD/VIDEODISK TECHNOLOGIES TO FACILITATE INDIVIDUALIZED MULTISENSORY LEARNING EXPERIENCES FOR INDIVIDUALS WITH DISABILITIES

    SBC: The Tuckerman Group Inc            Topic: N/A

    THIS PROJECT EXAMINES THE ABILITY OF A COMPUTER BASED LEARNING AID TO ADAPT TO THE INDIVIDUAL, LEARNING DISABLED CHILD BY CHANGING THE MANNER IN WHICH IT PRESENTS SUBJECT MATTER. THE ABILITY OF COMPUTER BASED SYSTEMS TO QUICKLY ADAPT, WITHLITTLE OR NO EXTERNAL INSTRUCTION, TO DIFFERING SITUATIONS, OFFERS CONSIDERABLE PROMISE FOR THE LEARNING DISABLED. THESE CHILDREN TYPICALLY REQUIRE HIGHLY PERSON ...

    SBIR Phase I 1990 Department of Education
  2. A HIGH RESOLUTION CDTE ARRAY MONITORING SYSTEM FOR MONITORING CONTAMINATION IN SOILS

    SBC: Radiation Safety Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  3. AN AUDIO-VISUAL STIMULATION UNIT WITH EEG BIOFEEDBACK FOR ENHANCING COGNITIVE ABILITIES OF LEARNING DISABED BOYS

    SBC: Bio-educational Research Inc.            Topic: N/A

    THIS PROJECT WILL DEVELOP AN INEXPENSIVE, PORTABLE, ELECTROENCEPHALOGRAPH (EEG) BIOFEEDBACK UNIT THAT PROVIDES AUDIO AND VISUAL STIMULATION (AVS) AT BRAINWAVE FREQUENCIES TO AID IN THE TREATMENT OF LEARNING DISABLED (LD) SCHOOL CHILDREN WITH ATTENTION DEFICIT DISORDER (ADD) OR WITH ATTENTION DEFICIT HYPERACTIVITY DISORDER (ADHD). THE UNIT WILL BE EASY ENOUGH TO OPERATE, SO THAT COUNSELORS AT SCHOO ...

    SBIR Phase II 1994 Department of Education
  4. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  5. A SIMPLE METHOD FOR SOLUBILITY TESTING OF RADIONUCLIDES ON AIR FILTER

    SBC: Radiation Safety Engineering, Inc.            Topic: N/A

    THE SOLUBILITY OF AIRBORNE RADIONUCLIDES IS AN IMPORTANT PARAMETER IN THE ASSESSMENT OF INHALATION HAZARDS IN THE WORKPLACE AND IN THE INTERPRETATION OF ROUTINE BIOASSAY DATA. SOLUBILITY IS A MAJOR FACTOR IN DETERMINING THE METABOLISM OF THE INHALED ISOTOPES AND DISSOLUTION RATES OF ALPHA-EMITTING COMPOUNDS WHICH ARE PARTICULARLY IMPORTANT DUE TO THEIR HIGH RADIOTOXICITY. CURRENT SOLUBILITY TESTIN ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  6. DECISION SUPPORT IN TRANSITION PLANNING

    SBC: REHABILITATION TECHNOLOGY, INC.            Topic: N/A

    TRANSITIONING STUDENTS WITH DISABILITIES FROM HIGH SCHOOL TOADULT LIFE IS A COMPLEX PROCESS. FEDERAL INITIATIVES IN TRANSITION MAKE SCHOOL PERSONNEL RESPONSIBLE FOR MANAGING THE PROCESS AMONG THE STUDENT, PARENT, ADULT AGENCY AND POTENTIAL EMPLOYER. THROUGH EXPERT INPUT, CRITICAL TRANSITION ELEMENTS WILL BE IDENTIFIED AND ORGANIZED BY PROJECT PERSONNEL. IN PHASE I, THE EXPERT OPINION WILL BE OBTAI ...

    SBIR Phase I 1990 Department of Education
  7. DEVELOPMENT OF A NEURAL NETWORK-BASED INCLUSION SIMULATION MODEL

    SBC: Syndicates Inc.            Topic: N/A

    VARIABLES THAT MIGHT LEAD TO WIDER ADOPTION OF INTEGRATED PRESCHOOL PROGRAMS INCLUDE EXPANSION OF THE WAY IN WHICH WE MAKE DECISIONS AND THE MANNER IN WHICH RELATED SERVICES ARE DELIVERED. EVALUATION EFFORTS SHOULD BE EXPANDED TO INCLUDE THE IMPACT OF VARYING METHODS OF INTEGRATION. THIS PROJECT PROPOSES THE DEVELOPMENT OF A COMPUTER INCLUSION SIMULATION MODEL THROUGH THE UTILIZATION OF NEURAL N ...

    SBIR Phase I 1994 Department of Education
  8. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  9. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  10. MARKETING MEDIA PROTOTYPE FOR STATE BUSINESS ENTERPRISE PROGRAMS TO ENHANCE PROPERTY MANAGER PRESENTATIONS

    SBC: REHABILITATION TECHNOLOGY, INC.            Topic: N/A

    THE PURPOSE OF THIS PROJECT IS TO USE MARKETING TECHNIQUES TO DEVELOP A NATIONAL PROTOTYPE TO ENHANCE PRESENTATIONS OF THE RANDOLPH-SHEPPARD PROGRAM TO PROPERTY MANAGERS. THE PROJECT FOCUSES ON WHAT ARE THE CURRENT AND POTENTIAL MARKETS, WHO HAS BEEN MARKETING THE RANDOLPH-SHEPPARD PROGRAM, HOW THEIR PRESENTATIONS CAN BE ENHANCED, AND WHAT WILL BE TEH BEST MEDIA TO PRESENT INFORMATION IN THE PROTO ...

    SBIR Phase I 1990 Department of Education
US Flag An Official Website of the United States Government