You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. A HIGH RESOLUTION CDTE ARRAY MONITORING SYSTEM FOR MONITORING CONTAMINATION IN SOILS

    SBC: Radiation Safety Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  2. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: T P L, INC            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  3. A SIMPLE METHOD FOR SOLUBILITY TESTING OF RADIONUCLIDES ON AIR FILTER

    SBC: Radiation Safety Engineering, Inc.            Topic: N/A

    THE SOLUBILITY OF AIRBORNE RADIONUCLIDES IS AN IMPORTANT PARAMETER IN THE ASSESSMENT OF INHALATION HAZARDS IN THE WORKPLACE AND IN THE INTERPRETATION OF ROUTINE BIOASSAY DATA. SOLUBILITY IS A MAJOR FACTOR IN DETERMINING THE METABOLISM OF THE INHALED ISOTOPES AND DISSOLUTION RATES OF ALPHA-EMITTING COMPOUNDS WHICH ARE PARTICULARLY IMPORTANT DUE TO THEIR HIGH RADIOTOXICITY. CURRENT SOLUBILITY TESTIN ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  4. CHARACTERIZATION OF CONCRETE CONDITION USING ACOUSTIC TOMOGRAPHIC IMAGING

    SBC: Atkinson-noland Assoc. Inc.            Topic: N/A

    RESIDUAL LIFETIME EVALUATION OF EXISTING NUCLEAR FACILITIES REQUIRES DETAILED INFORMATION REGARDING CONDITION OF CONTAINMENT AND SUPPORT STRUCTURES. CURRENT NONDESTRUCTIVE METHODS FOR SUBSURFACE EVALUATION OF REINFORCED CONCRETE USE COMPLEX EQUIPMENT AND RELY HEAVILY ON INTERPRETATION BY THE OPERATOR. A RESEARCH EFFORT IS PROPOSED TO EXAMINE THE USE OF COMPUTERIZED TOMOGRAPHIC IMAGING FOR LOCATING ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  5. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  6. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: Kalsi Engineering, Incorporated            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  7. TASK NETWORK MODELING OF HUMAN OPERATIONS IN NUCLEAR POWER PLANT CONTROL ROOMS

    SBC: Micro Analysis & Design Inc            Topic: N/A

    THE PURPOSE OF THIS EFFORT IS TO STUDY THE FEASIBILITY OF AND, HOPEFULLY, VALIDATE THE USE OF TASK NETWORK MODELING TOSTUDY HUMAN FACTORS IN THE CONTROL ROOM. TASK NETWORK MODELING EXTENDS A HUMAN ENGINEERING TASK ANALYSIS INTO A COMPUTER MODEL. WE PROPOSE THAT PERTURBING THE INDIVIDUAL TASKS IN A TASK NETWORK MODEL IN A MANNER PREDICTED FROM CONTROL ROOM DESIGN CHANGES, TASK AUTOMATION, OR THE CO ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government