You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
-
Development of a Performance Assessment Process Controller
SBC: Innovative Tech. Solutions Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS
SBC: Risk Management Systems Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
SPECIAL MONITOR DETECTOR DEVELOPMENT FOR RESPIRATOR CONTAMINATION
SBC: Shonka Research Associates Topic: N/AIMPLEMENTATION OF AN INTEGRATED DETECTION SYSTEM FOR CONTAMINATION MONITORING OF RESPIRATORS HAS BEEN PROBLEMATIC. BECAUSE OF THE COMPLEX SURFACES, HAND MONITORING USING PORTABLE SURVEY INSTRUMENTATION HAS BEEN THE PREFERRED METHOD. HAND MONITORING IS COSTLY IN TIME AND OFTEN FAILS TO RELIABLY ACHIEVE A GIVEN DETECTION LIMIT BECAUSE OF VARIABLES SUCH AS SURVEY SPEED ANDDISTANCE FROM THE PROBE. THE ...
SBIR Phase II 1994 Nuclear Regulatory Commission -
A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material
SBC: Shonka Research Associates Topic: N/AN/A
SBIR Phase II 1996 Nuclear Regulatory Commission -
A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material
SBC: Shonka Research Associates Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, Inc. Topic: N/ATHE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...
SBIR Phase II 1994 Nuclear Regulatory Commission