You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. THE READY COURSE, AN INTERACTIVE VIDEODISC ASSISTED READING PROGRAM

    SBC: Applied Interactive Tech            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Education
  2. PEN-SIZE PAPER CURRENCY READER

    SBC: APPLIED SCIENCES LABORATORY, INC.            Topic: N/A

    DIFFERENTIATING AMONG THE DENOMINATIONS OF U.S. CURRENCY IS A PROBLEM FOR THE VISUALLY HANDICAPPED. CURRENTLY AVAILABLE DEVICES THAT ASSIST THE BLIND IN DETERMINING CURRENCY DENOMINATIONS ARE RELATIVELY LARGE AND EXPENSIVE. THE PROPOSED RESEARCH AND DEVELOPMENT IS A SYSTEMATIC APPLICATION OF PATTERN RECOGNITION AND MICRO-ELECTRONICS TECHNOLOGY TO DEVELOP A PEN-SIZE PAPER CURRENCY READER. RECENT AD ...

    SBIR Phase II 1994 Department of Education
  3. RESTORATION OF THE COMPETITIVE CAPABILITY AND PROFITABILITY OF RANDOLPH SHEPPARD VENDOR BUSINESSES BY INTRODUCING INNO-VATIVE EQUIPMENT TECHNOLOGIES AND NEW FOODSERVICE MARKETING PROGRAMS AND PRODUCT CONCEPTS.

    SBC: General Research And Analysis            Topic: N/A

    FOR 50 YEARS THE RANDOLPH-SHEPPARD VENDING PROGRAM HAS MEANTEMPLOYMENT AND INDEPENDENCE TO THE BLIND. TODAY, HOWEVER, THE PROGRAMS AND ITS VENDOR MEMBERS FACE SEVERE CHANGES IN THE BUSINESS ENVIRONMENT THAT THREATEN THE LONG TERM ECO-NOMIC STABILITY OF MANY INDIVIDUAL OPERATORS AND PERHAPS THEENTIRE PROGRAM. THIS NEW BUSINESS ENVIRONMENT FEATURES IN- TENSIFIED COMPETITION FROM THE PRIVATE SECTOR, ...

    SBIR Phase I 1988 Department of Education
  4. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  6. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government