  1. NEW SENSOR FOR MEASUREMENT OF AIR MOVEMENT

    SBC: ANALYSIS AND MEASUREMENT SERVICES CORPORATION            Topic: N/A

    THIS PROPOSAL IS PREPARED IN DIRECT RESPONSE TO THE NRC'S SOLICITATION FOR AN IMPROVED DEVICE TO MEASURE AIR MOVEMENT FOR PERSONNEL RADIATION PROTECTION AND HEALTH PHYSICS APPLICATIONS IN NUCLEAR FACILITIES. THE PURPOSE OF THE NEW DEVICE IS TO PROPERLY LOCATE AIR SAMPLERS SO THAT THE AIR SAMPLED IS REPRESENTATIVE OF THE AIR INHALED BY WORKERS. ALTHOUGH AIR FLOW RATE SENSORS SUCH AS ANEMOMETERS ARE ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  2. EXPERIMENTAL EVALUATION OF FIBER OPTIC PRESSURE SENSORS FOR NUCLEAR POWER PLANTS

    SBC: ANALYSIS AND MEASUREMENT SERVICES CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  3. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, Inc            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  4. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICES CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  6. DEV OF A LARGE CROSS SECTIONAL AREA SELF-POWERED DETECTOR

    SBC: K E M P CORP            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  7. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government